Permit Number: DP18-0071
Parcel: 11307243A

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0071
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/24/2018 KELLY LEE START PLANS SUBMITTED Completed
06/07/2018 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Mountain Adelaide - 60 Unit Multi-Family FLD
Development Package (2nd Review)
DP18-0071 - R-2 Zoning

TRANSMITTAL DATE: June 7, 2018
DUE DATE: June 22, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is March 28, 2019.



2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD - ADDITIONAL REQUIREMENTS)


1. Follow Up To Previous Comment 18: It does not appear that the FOS Area depicted and labeled on the FOS detail on sheet 6 provides the required additional 20% FOS. In addition explain how the detention basins are functional. These two areas do not appear to provide any functional use.

Based on the number of units and greater 13 DU/AC the FOS per unit is 161 SF. 9660 x 20% = 11,592 SF. Per the detail on sheet 6 the total SF noted is 11,193. In addition it does not appear that the detention areas are functional.

2-06.5.3.B - Maximum Density Option
Applicants requesting a Maximum Density Option in accordance with Section 8.7.3.C.3.b must demonstrate compliance with the applicable criteria by written report or on the plat or site plan, whichever is appropriate;

PREVIOUS COMMENT 18: Demonstrate compliance with the Standard above in order to utilize the Maximum Density Bonus.


2. Follow Up To Previous Comment 19: See related comment 2. If it is determined that the detention basins do not provide or are consistent with the functional open space requirements revise the areas as required.

2-06.5.3.C - Functional Open Space
Delineate the boundaries of the proposed functional open space on the tentative plat or site plan, whichever is applicable. Provide, by note on the plat, the required and proposed functional open space calculations;

PREVIOUS COMMENT 19: Delineate for clarity the Functional Open areas and label the sf of each area.



If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/07/2018 DAVID RIVERA ZONING HC REVIEW Reqs Change see zoning comments
06/18/2018 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change UNIFIED DEVELOPMENT CODE
4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
8.7.3. FLEXIBLE LOT DEVELOPMENT (FLD)

Detention and Retention Basins

To the greatest degree practicable, detention and retention basins within an FLD shall be designed as Functional Open Space by incorporating the Multiple-Use Concepts and Aesthetic.
Verify how the detention basins are functional open space.
Based on the number of units and greater 13 DU/AC the FOS per unit is 161 SF. 9660 x 20% = 11,592 SF. Per the detail on sheet 6 the total SF noted is 11,193.
Verify the correct calculation for FOP and revise plans as necessary.
Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval.
Additional comments may apply.
06/20/2018 KLEE1 PIMA COUNTY - ADDRESSING PIMA COUNTY - ADDRESSING Reqs Change Good morning,



DP18-0071 Mountain Adelaide FLD / 2nd Submittal is being returned for corrections. Please refer to the comments on the attached plan.



Feel free to contact me if you have any questions.



Thank you



Nicholas Jordan

Addressing Specialist

Pima County Development Services Department

201 N Stone AV – 1st Floor

Tucson, AZ 85701

(520) 724-9623

SEE REDLINED PDF in PRO
06/20/2018 JOHN VAN WINKLE ENGINEERING REVIEW Approved
06/21/2018 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
Prepare a Comment Response Letter which tells the reviewer what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to PDSD Filedrop:
1) Corrected plan set
2) Items requested by review staff
Please remember to name your files appropriately, for example: second (2nd) submittal,
3_plan_set.pdf
3_swppp_report.pdf and the plans will re-enter the review cycle.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/28/2018 KLEE1 OUT TO CUSTOMER Completed