Permit Number: DP18-0067
Parcel: 11705033A

Address:
314 E 6TH ST

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0067
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/13/2018 ALEXANDRA HINES START PLANS SUBMITTED Completed
11/14/2018 MASHFOR1 COT NON-DSD FIRE Approved Required Changes were added based on Martin Browns previously notes pertaining to this project concerning Fire hydrants and Fire Service expectations. Please provide all deferred submittals to Tucson Fire Department for review as also indicated on this plans set.
11/20/2018 GARY WITTWER COT NON-DSD TDOT Reqs Change 11/19/18

Gary Wittwer, Gary.Wittwer@tucsonaz.gov

Please add the attached notes to the plans. Note item 3. The developer will be responsible for any damage claims.

City of Tucson
Department of Transportation
Standard Notes for Planting in ROW

1. It is the owner's responsibility to keep the Sight Visibility Triangles (SVT), and the pedestrian access area clear of vegetation at all times, per Land Use Code (LUC) section.
2. It is the owner responsibility to keep a 5' wide by 7' tall clear pedestrian access open across the entire property.
3. It is the owner responsible to keep vegetation from growing past the curb line clear, and keep a 15' high clear zone over the travel lane.
4. Final plant locations must be in compliance with all utility setback requirements.
5. The owner understands that if the City of Tucson Transportation Department or any utility company needs to work within the ROW in the landscaped area, plants and irrigation may be destroyed without replacement or repair.
6. The owner takes full liability for this landscape and irrigation, and any damage to roadway, sidewalk and utilities.
7. The only private irrigation equipment that is allowed within the ROW are lateral lines, tubing and emitters that are not under constant pressure. All other equipment must be on private property. (excluding water meter)
8. Contractor to obtain a Right Of Way permit prior to construction within the right-of-way.
12/05/2018 LOREN MAKUS ENGINEERING REVIEW Approved
12/05/2018 SBEASLE1 COT NON-DSD ENVIRONMENTAL SERVICES Approved 12/05/18

The Environmental & General Services Department (EGSD) has reviewed the third submittal of the Development Plan for Union on 6th (DP18-0067).
The EGSD comments on the second submittal of the Development Plan were successfully addressed by Cypress Civil Development in the third submittal. A compactor is proposed to reduce the volume of refuse and recycling materials by 75%. The Development Plan specifies the compactor room location and the location for the container placement along the road on the east side of Building 1.

Based on this review, EGSD approves the solid waste management plans proposed for the Union on 6th development.
Please contact me if there are any questions concerning this review.
Tom Ryan, P. E.
City of Tucson - Environmental & General Services Department
12/05/2018 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved 12/05/18

DP18-0067 Union on 6th / 3rd Submittal is Approved by Pima County Addressing.
Thank you,
Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV - 4th Floor
Tucson, AZ 85701
(520) 724-7570
12/05/2018 ALEXANDRA HINES DESIGN PROFESSIONAL REVIEW Approved ***See letter in documents table in PRO.***

As requested, I have reviewed the 30-page Development package (8845432, 4, pdf, 1_DP_LP_2018-03-20.pdf) and found it to be in conformance with the last set of design renderings that I saw (11.27.18 Union Updated Renderings) and my last review letter of the design package (November 18, 2018 and attached).

Thank you.

Corky Poster
Architect / Planner/ Principal

POSTER FROST MIRTO, INC.
ARCHITECTURE | PLANNING | PRESERVATION

317 North Court Avenue
Tucson, Arizona 85701
P 520.882.6310
C 520.861.6320
www.posterfrostmirto.com
12/06/2018 ANDREW CONNOR LANDSCAPE REVIEW Approv-Cond The landscape plan cannot be completely approved until the overlay review is complete and obtained all the appropriate divisions reviews and approvals for the project.
12/13/2018 AHINES2 ZONING HC REVIEW Approved
12/14/2018 ALEXANDRA HINES COT NON-DSD REAL ESTATE Reqs Change Provide documentation in re-submittal.

Should any ground or aerial encroachments into City right-of-way come to be included, applicant is requested to contact the Real Estate Division to apply for easements. Any development in Herbert Ave or in the 4th and 5th Aves and 6th St RoW that cannot be addressed by a PIA should be directed to Real Estate as well.

John Cahill
Interim Real Estate Administrator
City Dept. of Transportation
201 North Stone Av. 6th Floor
Tucson, AZ 85701
(520) 837-6768
12/14/2018 ALEXANDRA HINES ZONING REVIEW Reqs Change FROM: Alexandra Hines, AICP - Lead Planner

PROJECT: DP18-0067 Union on 6th (3rd Review)

TRANSMITTAL DATE: December 14, 2018

COMMENTS: Please resubmit revised drawings with a detailed response letter, which states how all zoning review comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

1. UDC 3.3.3.G.5.c - An applicant has one year from the date of application, 3/23/18, to obtain approval of a site plan.

2. 2-06.4.8.B - Acknowledged that the following comment #5 is still outstanding pending modification approval. >> Provide vacation of five (5) foot telephone easement in conflict with building #2, prior to approval of plan unless written permission from easement holder(s) is provided.

3. 2-06.4.9.A - Acknowledged that the following comment #6 is still outstanding pending approval. >> Show combination information for lots under building #1.

Additional review comments may be forthcoming due to response to zoning review comments or other review agency comments including owner driven changes to the plan. Provide the director's decision letter for IID overlay in submittal to obtain development package approval.

If you have any questions about this transmittal, please contact Alexandra Hines at (520) 837-6975 or alexandra.hines@tucsonaz.gov.
12/17/2018 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Plans Returned for Corrections (RFC) Notice: DP18-0067
Project Description: E SITE/GRADE/SWPPP/IID - UNION ON 6TH

The review has been completed and a resubmittal is required.
To see review comments about the plans, visit PRO at www.tucsonaz.gov/PRO, then search by activity number.
(If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made to the plans, submit the following items to PDSD Filedrop at www.tucsonaz.gov/file-upload-pdsd.
The plans will then re-enter the 20-working-day review cycle.
1) Comment Response Letter
2) Corrected plan set
3) Items requested by review staff
Please type the activity number in the Project Description and name the files as described on the PDSD Filedrop web page.
The current fee balance is $ 165.00 (see image below). Review fees must be paid prior to the next submittal review.
Alexandra Hines, copied, is the Project Manager to contact with any questions: (520) 837-6975.
Thank you.

Sharon Beasley
City of Tucson
Planning and Development Svcs. Dept.
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
12/17/2018 SBEASLE1 OUT TO CUSTOMER Completed