Permit Number: DP18-0020
Parcel: 116271630

Review Status: Completed

Review Details: TENTATIVE PLAT REVIEW

Permit Number - DP18-0020
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/24/2018 LPEREZ2 START PLANS SUBMITTED Completed
05/24/2018 KLEE1 WWM REVIEW Passed Separate wastewater submittal is required. Contact sewer@pima.gov
05/24/2018 KELLY LEE DESIGN PROFESSIONAL REVIEW Passed Per Response letter- AVP will be submitted prior to building plan submittal.
06/04/2018 KELLY LEE ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Kelly Lee
Lead Planner

PROJECT: Alta Linda at Starr Pass, an FLD Subdivision
Development Package (1st Review)
DP18-0020

TRANSMITTAL DATE: June 4, 2018

DUE DATE: June 20, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 14, 2019.

2-06.3.0 FORMAT REQUIREMENTS

Section 8.7.3: Flexible Lot Design

1. 2-06.5.2.A -Change lot coverage to site coverage.

2. 2-06.5.3.C - You indicate that common area D-1 is FOS. The corresponding acreages on sheet 2 indicates 6,686sf. However, the cover sheet indicates 37,980. Are there more open space areas with functional amenities?


If you have any questions about this transmittal, please Name, (520) 837-6999 or Kelly.Lee@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
06/04/2018 KLEE1 H/C SITE REVIEW Approved
06/04/2018 MARTIN BROWN COT NON-DSD FIRE Approved PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

DP18-0020 Alta Linda at Starr Pass 06/19/2018

() Final Plat
(X) Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other - Elevations



SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() Approval
(X) Rezoning history on site
(X) Denied
() Annexation history on site
() No Rezoning history on site - No Resubmittal Required:
() Tentative Plat
() Landscape Plan
() Other










REVIEWER: MM DATE: 06/19/2018

COMMENTS

Site is addressed 1211 S Avenida Del Correcaminos and is currently in its 2nd review for
DP18-0020. Site has rezoning history to monitor per development package checklist, which indicates rezoning conditions do apply. Alta Linda at Starr Pass is subject to rezoning C9-92-12. Please indicate or graphically show how rezoning conditions 1. E. & J. and 2.C. are being met.
06/18/2018 ANDREW CONNOR LANDSCAPE REVIEW Approved
06/19/2018 JOHN BEALL COT NON-DSD URBAN PLANNING & DESIGN Denied PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

DP18-0020 Alta Linda at Starr Pass 06/19/2018

() Final Plat
(X) Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other - Elevations



SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() Approval
(X) Rezoning history on site
(X) Denied
() Annexation history on site
() No Rezoning history on site - No Resubmittal Required:
() Tentative Plat
() Landscape Plan
() Other










REVIEWER: MM DATE: 06/19/2018

COMMENTS

Site is addressed 1211 S Avenida Del Correcaminos and is currently in its 2nd review for
DP18-0020. Site has rezoning history to monitor per development package checklist, which indicates rezoning conditions do apply. Alta Linda at Starr Pass is subject to rezoning C9-92-12. Please indicate or graphically show how rezoning conditions 1. E. & J. and 2.C. are being met.
06/20/2018 ANDREW CONNOR NPPO REVIEW Approved
06/20/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Lot 10, which is downstream of manhole #3, will require the installation of a backwater valve (rim elevation 2716.40'; FFE of 2717.20'). [Initial comment: Verify the need for backwater valves for lots 2, 9, 10, 19, and 20. Lots that will have a finished floor elevation 12" or more above the rim elevation of the next upstream manhole or cleanout may not discharge through a backwater valve (see lots 9 and 10). Reference: Section 715.1, IPC 2012 as amended by the City of Tucson.]
06/21/2018 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. As indicated on the general notes, variances to the requirements of the Hillside Development Zone will be required for approval of this project. The following need to be addressed:
A. Provide the approval information in the note indicating a variance has been approved..
B. Once the Technical Standard Modification Request has been approved, include the approval information in the note.
4. Provide sufficient existing grade information on for lot 1 to demonstrate compliance with the differential grading standard of TSM 2-01.8.1.A. If you have received written communication indicating it is not applicable in this circumstance, provide a copy for the record. Otherwise complete the process in the Technical Standard.
06/22/2018 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
07/24/2018 SVALENZ1 OUT TO CUSTOMER Completed