Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - REVISION
Permit Number - DP18-0016
Review Name: DEV PKG - REVISION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/06/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
03/12/2019 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: El Rio Southeast Expansion Development Package (1st Revision) DP18-0016 TRANSMITTAL DATE: March 12, 2019 DUE DATE: Over the counter COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. 2-06.4.9.O - Per a Zoning determination when a project boarders on two or more streets with one street being designated on the COT MS& R map all street perimeter yard setbacks will be based on developing area setbacks. That said the proposed 10'-0" perimeter yard setback shown along Langley Ave does not appear to meet the required perimeter yard setback of 21' or the height, greater of the two, measured to the outside edge of the nearest adjacent travel lane. Contact Mark Castro for process to reduce the street perimeter yard. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
03/13/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
03/19/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. The landscape plan will contain the following identification in the lower right corner of each sheet: Board of Adjustment case; Design Development Option case; Any other relevant case number for reviews or modifications that affect the site. 7.6. LANDSCAPING AND SCREENING The following apply to landscape borders. One canopy tree is required for every 33 linear feet of landscape border or fraction thereof, excluding vehicular ingress or egress points. Structural Overhangs Covered parking canopies or other structural canopies, such as those used in service stations, may not overhang into street landscape borders in order to avoid conflicts between the structures and crowns of trees. Removal of any required landscape elements will require Board of Adjustment Variance (UDC 3.11.1). Ensure that all zoning comments are addressed. |
03/20/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | REVISION PLAN RETURNED FOR CORRECTIONS NOTICE The revision reviews have been completed and a resubmittal is required. Activity Number: DP18-0016 Project Description: SITE/GRADING/SWPPP- EL RIO SE EXPANSION To view revision review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) After the necessary corrections have been made, name your documents accordingly - a 2nd revision submittal document would be titled: REV-1_2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, enter the Activity Number. 1) Comment Response Letter (lists changes to the Plan and which review comments are being addressed) 2) Corrected plan set with all documents (the full set) 3) Items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero). The Project Manager can be reached via email: Andrew.Connor@TucsonAz.gov or phone: (520) 837-4950. Thank you. City of Tucson Planning and Development Services Attn: Sharon Beasley 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/20/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |