Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP18-0011
Parcel: 12416103A

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP18-0011
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/02/2018 BLARSON1 START PLANS SUBMITTED Completed
04/02/2018 ALEXANDRA HINES OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approv-Cond Comment not addressed in previous submittal.

The Tucson Airport Authority conditionally approves the subject request contingent upon the following conditions of approval, as noted below. These conditions should be identified in the general notes of the approved development plan.

Conditions of approval:

"According to the FAA Notice Criteria Tool, this project is located in proximity to a navigation facility and could impact navigation signal reception. The applicant shall file Form 7460 with the FAA at least 45 days before construction activities begin for the project. Any cranes which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp"

"That prior to the City's approval of any construction permit for a permanent building, the property owner shall record the Avigation Easement which discloses the existence, and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The content of such documents shall be according to the form and instructions provided."
04/20/2018 SSHIELD1 ZONING HC REVIEW Approved
04/20/2018 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Principal Planner

PROJECT: Elliott Electronic Supply
Development Package (2nd Review)
DP18-0011

TRANSMITTAL DATE: April 20, 2018

DUE DATE: April 30, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 16, 2019.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

1. Until this comment is addressed the DP cannot be approved. 2-06.4.7.A.6.a - This project is located within the Airport Avigation Easement and Disclosure Area and will require review by Scott Robidoux Airport Planner. Contact Kelly Lee, Lead Planner COT at Kelly.Lee@tucsonaz.gov for requirements.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2. This comment was not fully addressed. Setbacks in Developing Area are measured from the property line not back of curb as listed under setbacks "*", see UDC Article 6.4.5.C.1. Remove the reference to back of curb from the plan. 2-06.4.9.O - The street setbacks listed under "DEVELOMENT PLAN NOTES AND CALCULATIONS" are not correct. This site does not boarder on an MS&R or meet the definition of Developing Area, see UDC Article 11.4.5. The street perimeter yard setbacks should be 20 or 1-1/2 the height of the building exterior wall, greater of the two.

Once the above comments are approved Zoning will provide an over-the-counter review. Call or email to schedule an appointment for this review.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
04/27/2018 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change UNIFIED DEVELOPMENT CODE

Graphically show compliance with landscaping and screening requirements for the entire site by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements.
2-06.3.5 - Remove Development Package PDSD approval stamp on all sheets. Reserve a three-inch by five-inch space in the lower right quadrant of each sheet for an approval stamp. The approval stamp will be applied electronically.

2-06.4.9.U - Indicate graphically, where possible, compliance with conditions of rezoning.

Ensure that all Zoning comments and concerns are addressed prior to landscape approval.
Additional comments may apply.
05/02/2018 JOHN VAN WINKLE ENGINEERING REVIEW Approved
05/03/2018 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
05/03/2018 BLARSON1 OUT TO CUSTOMER Completed