Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP18-0008
Parcel: 10706083A

Address:
910 W GLENN ST

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP18-0008
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2018 ARUIZ1 START PLANS SUBMITTED Completed
01/17/2018 KELLY LEE OTHER AGENCIES PIMA ASSN OF GOVTS Passed
01/17/2018 KELLY LEE UTILITIES SOUTHWEST GAS Passed
01/17/2018 KELLY LEE OTHER AGENCIES U. S. POST OFFICE Passed
01/31/2018 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change Unified Development Code
2-10.4.0 CONTENT REQUIREMENTS
4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
Cross-reference to:
Rezoning case
Include the rezoning conditions on the cover sheet.
SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS
Screening
Height of screening material and reference point for measurement;
Type of screening material (e.g., masonry wall, wood fence, species of plant material).
Ensure that all Engineering and Zoning comments and concerns are addressed.
Additional comments may apply.
01/31/2018 ANDREW CONNOR NPPO REVIEW Approved
02/01/2018 MARTIN BROWN COT NON-DSD FIRE Approved
02/06/2018 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
02/06/2018 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Denied PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

DP18-0008 American Roofing 02/06/2018

() Final Plat
(X) Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other - Elevations



SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() Approval
(X) Denied
() Rezoning history on site
() Annexation history on site
() Tentative Plat
(X) Development Plan
() Landscape Plan
() Other







REVIEWER: MM
DATE: 02/06/2018

COMMENTS

As Per rezoning case C9-12-08, condition #1: Requires development plan to be in substantial compliance with the preliminary development plan dated June 13, 2012, and subject to be in compliance with the Design Compatibility Report. Shall be required and to be submitted and approved in accordance with section 2-06 of the Unified Development Code.
It appears that since the last preliminary development plan (PDP) dated June 13, 2012, some building reconfiguration and additional buildings are being proposed to the current development package under review. It has been determined that this change in site design does require a major change. A request letter for major change must be submitted, fees may be included for review and approval. Contact John Beall for any further questions at (520) 837-6966.


-Rezoning condition 9: Building facades at the rear and sides shall have architectural character and detail comparable to the front façade, including but not limited to color palette, non-glare roof material/lines, and exterior material. A color palette and dimensional elevation drawings shall be submitted as part of the development package submittal to demonstrate compliance with this condition.
02/07/2018 MMORENO1 ZONING HC REVIEW Reqs Change
02/07/2018 ALEXANDRA HINES PIMA COUNTY ADDRESSING Approved DP18-0008 American Roofing / 1st Submittal is Approved by Pima County Addressing. Please see the attached pdf for the addresses that will be issued when the Development Package is approved.

Thank you,

Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
02/07/2018 MMORENO1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Michael Moreno
PDSD Zoning Review Section

PROJECT: American Roofing
Development Package (1st Review)
DP18-0008

TRANSMITTAL DATE: January 7, 2018
DUE DATE: February 7, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 7, 2019.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section



CONTENT REQUIREMENTS



2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: Provide the development package case number, DP18-0008, adjacent to the title block on each sheet.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the Unified Development Code (UDC). List all UDC sections applicable to the proposed uses.

2. COMMENT: C-2: 4.9.13.P

2-06.4.8 - Existing Site Conditions

The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

3. COMMENT: Please provide the information noted by the standard.

2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

4. COMMENT: Please clarify ingress easement on the utility site plan sheet and if it will it remain or be abandoned.


2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

5. COMMENT: Provide a ramp at the accessible aisle between the accessible parking spaces, will an accessible ramp continue to the warehouse.

2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

6. COMMENT: Please provide the long term bicycle parking facility location within the building.

2-06.4.9.J - If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way lines for those streets. (Add the MS&R future sidewalk, right-of-way lines, sight visibility triangles, etc.)

7. COMMENT: The future MS&R for Glenn Street is to be 64 feet per the adopted MS&R plan. Currently the right of way is shown at 57 feet, please verify with TDOT about the right of way dedication for Glenn Street.


2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

8. COMMENT: Please provide a dimension from face of the proposed columns to the building wall, minimum width required is 4 feet.

2-06.4.9.S - Show existing or proposed pedestrian circulation along abutting rights-of-way. Such sidewalks must comply with accessibility requirements for the physically disabled and the design criteria in Section 10-01.0.0, Street Technical Standards, of the Technical Standards Manual.

9. COMMENT: -Rezoning condition 25: States a six-foot-wide sidewalk shall be installed along the Glenn street frontage of the Project.



2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required.

10. COMMENT: All proposed and new sings will have to go through the permit process and will require a new permit.



Additional Comments:

-Rezoning condition 1: A Development package in substantial compliance with the preliminary development plan dated June 13, 2012, and Design Compatibility Report is to be submitted and approved in accordance with Section 2-06 of the Unified Development Code (UDC)

-Rezoning condition 9: Building facades at the rear and sides shall have architectural character and detail comparable to the front façade, including but not limited to color palette, non-glare roof material/lines, and exterior material. A color palette and dimensional elevation drawings shall be submitted as part of the development package submittal to demonstrate compliance with this condition.

-Rezoning condition 15: Provide ten foot (10) landscape border with canopy trees and six (6) foot tall masonry wall along the entire north and east boundaries of the rezoning site.

-Rezoning condition 19: Six (6) inch wide fence block or greater shall be used for perimeter walls

-Rezoning condition 25: States a six-foot-wide sidewalk shall be installed along the Glenn street frontage of the Project.




RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
02/12/2018 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702

February 5, 2018



WR# 6219086

DSD_CDRC@tucsonaz.gov
thadley@cypresscivil.com

Dear Theresa

SUBJECT: American Roofing - 1st Submittal
901 W Glenn St
DP18-0008

Tucson Electric Power Company has reviewed and approved the development plan.

There are possible conflicts within the existing development. Customer to contact TEP and make an application for any relocation or removal of facilities, this will be billable. If the existing meter is to be removed, the customer must return the removal form signed by the property owner and make a removal application. Approved plans are required for new service.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans.

If easements are required, they will be secured by separate instrument. Your final plans should be sent to:
Tucson Electric Power Company
Attn: Rich Harrington
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-917-8726

Should you have any technical questions, please call the area Designer, Jessica Marchbanks @ 917-8737.

Sincerely,
Beth Shelton
Elizabeth "Beth" Shelton
Admin Assistant, Design
02/14/2018 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
02/16/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change 1) Sheet 1: Show watercourses on location map per Administrative Manual section 2-06.4.4.B
2) Sheet 1: Clarify Actual Building Height indicated as 15' vs building height of warehouse shown as 15.5'. (Roof Height vs Wall Height used in setback calculations)
3) Sheet 3: Per response from Alberto Navarro on 12-06-2017, comment 25, a 6' wide sidewalk is to be installed along Gleen Street. A 5' wide sidewalk is dimensioned, please clarify
4) Sheet 3: Remove misc dimension arrows (see warehouse building for example)
5) Sheet 4: Finished floor elevations for warehouse buildings do not appear to be correct
5) Sheet 4: Section B indicates a curb or wall where applicable. Denote or otherwise identify on plans the curb and wall. Side slopes of drainage channel/basin require a barrier.
6: Gross area of site is greater than 1 acre. A Storm Water Pollution Prevention Plan is required

John Van Winkle
john.van-winkle@tucsonaz.gov
520-837-5007
02/21/2018 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
06/07/2018 KROBLES1 REJECT SHELF Completed