Permit Number: DP17-0249
Parcel: 117082240

Address:
17 W 19TH ST

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP17-0249
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/11/2019 SBEASLE1 START PLANS SUBMITTED Completed
06/13/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
06/13/2019 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed Review not required. This agency was notified for their information only.
06/13/2019 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed Review not required. This agency was notified for their information only.
06/19/2019 SBEASLE1 COT NON-DSD ENVIRONMENTAL SERVICES Reqs Change The Environmental & General Services Department has reviewed the Development Package for The Flash property located at 834 S. 6th Avenue. The proposal includes 52 units of apartment space.
The waste generation calculations were reviewed and found to be correct.
Trash enclosures are proposed for the west side of the northern parcel and for the west side of the southern parcel. The detail drawing of the enclosure on Sheet 6 states "See architectural plans for full trash enclosure details". Please have the applicant submit the trash enclosure details from the architectural plans for further review. Additional review comments can be made after review of these drawings.
Thanks.

Tom Ryan, P. E.
City of Tucson - Environmental & General Services Department
06/25/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Verify the presence of possible sanitary sewers located below the proposed building #3. The Pima County GIS data only shows the public sewer running along Russell Avenue. The HCS shown for building #3 may be a storm sewer. Determine the material and depth of the pipes so that the structural engineer can evaluate their possible effect on the building design.
2. Determine which manhole is upstream from the sewer connection for building #3 and verify its rim elevation.
3. In the first submittal, the rim elevation of manhole 9891-01 was 2407.27' but it is now 2404.22'. Verify the rim elevation; since buildings #1 and #2 now have a FFE = 2407.30', a backwater valve is not allowed.
06/26/2019 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Reqs Change June 26, 2019
Sharon Beasley, Permit Technician
City of Tucson
Public Works Buildings - 201 North Stone Avenue
Tucson, AZ. 85701
RE: DP17-0249 The Flash, 2nd Submittal, Received June 13, 2019
Dear Ms. Beasley,
Thank you for the opportunity to comment on DP17-0249, The Flash; 2nd Submittal, a development package application for an approximately 0.7 acre site, with the majority project area located northwest of the intersection of East 19th Street and South 6th Avenue and the minority project area located southeast of the intersection of East 19th Street and South Russell Avenue. The zoning for this project is Commercial Zone 3 (C-3) and the proposed project would establish new residential and commercial uses.

This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.

The Tucson Airport Authority conditionally approves the subject request contingent upon the following condition of approval, as noted below. This condition shall be identified in the general notes of the revised development plan.
Condition of approval:
1. "According to the Federal Aviation Administration (FAA) Notice Criteria Tool, this project area is located in proximity to a navigation facility and could impact navigation signal reception. The project applicant shall file FAA Form 7460 with the FAA at least 45 days before construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA), provides the project applicant with written communication that filing FAA Form 7460 is not required. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp"

The Tucson Airport Authority highly recommends the property owner consider adding the following optional note to their revised development plan. This proposed note is meant to be a second method of notification, but only for residential related uses, that future property owners and tenants are living near an airport. The Tucson Airport Authority believes this proposed note help to support the City of Tucson Airport Environs Overlay Zone and supports Plan Tucson - Regional and Global Positioning policy 4 (RG-4).
1. For only residential uses - "The developer shall provide the Airport Disclosure Statement form, at time of sale, to the new property owners with new unit purchases. In the event the development of any residential uses does not involve the sale of new units, but is instead offering rental residential units to the public, the new tenant of the rental unit shall be provided a copy of the Airport Disclosure Statement form. The intent of the Airport Disclosure Statement form is to educate and notify the new residents that they are living near an airport. The content of such documents shall be according to the form and instructions provided."
The new property owner or new tenant shall forward a signed copy of the Airport Disclosure Statement form to the Tucson Airport Authority, using the mailing address provided below.
Scott Robidoux, Senior Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard, Suite 300
Tucson, AZ 85756

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,
Scott Robidoux, Senior Airport Planner

email cc: Hector Jimenez
06/26/2019 MARTIN BROWN COT NON-DSD FIRE Approved
07/01/2019 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved July 1, 2019
ACTIVITY NUMBER: DP17-0249
PROJECT NAME: The Flash
PROJECT ADDRESS: 17 & 20 W 19th Street
PROJECT REVIEWER: Zelin Canchola TDOT

The proposed improvements in the right of way are acceptable.

1. At time of construction in the right of way permit will be required.

2. Close any unused driveways. Show on plan.


If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov
07/01/2019 SBEASLE1 COT NON-DSD TDOT Reqs Change DP17-0249 SITE/GRADING/ IID - The Flash, 30-unit apt. project
TDOT LANDSCAPE:
The comments from the previous submittal were not addressed. Please add the following notes to the Landscape Plan.

City of Tucson
Department of Transportation
Standard Notes for Planting in ROW
1. It is the owner’s responsibility to keep the Sight Visibility Triangles (SVT), and the pedestrian access area clear of vegetation at all times, per Land Use Code (LUC) section.
2. It is the owner responsibility to keep a 5’ wide by 7’ tall clear pedestrian access open across the entire property.
3. It is the owner responsible to keep vegetation from growing past the curb line clear, and keep a 15’ high clear zone over the travel lane.
4. Final plant locations must be in compliance with all utility setback requirements.
5. The owner understands that if the City of Tucson Transportation Department or any utility company needs to work within the ROW in the landscaped area, plants and irrigation may be destroyed without replacement or repair.
6. The owner takes full liability for this landscape and irrigation, and any damage to roadway, sidewalk and utilities.
7. The only private irrigation equipment that is allowed within the ROW are lateral lines, tubing and emitters that are not under constant pressure. All other equipment must be on private property. (excluding water meter)
8. Contractor to obtain a Right Of Way permit prior to construction within the right-of-way.

Additional TDOT LANDSCAPE COMMENTS:
1. Please add the Sight Visibility Triangles in all directions to the Landscape Plan.
2. Keynote 23 on Sheet 4 of 10 references a Hardscape Plan in regard to new Landscape Area. There is no Hardscape Plan in the set and no information on the proposed landscape areas. Place trees in grates closer to property line similar to those in front of 934 S. Sixth for consistency in the corridor. Provide details on new grates and any changes to existing sidewalk and disposition of TDOT landscape property.
3. Dimension the area between the sidewalk and the curb at buildings 1 and 2, there does not appear to be enough room for planting a tree in this area. See comment 2 for placement of trees in relation to sidewalk and curb.

The DSD Landscape Comments from the last review were not addressed in the Comment Response Letter submitted on June 3, 2019.
Please address and provide responses to these comments.
UNIFIED DEVELOPMENT CODE 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. The landscape plan will contain the following identification in the lower right corner of each sheet: Cross-reference to: a. Rezoning case; b. Subdivision case; c. Board of Adjustment case; d. Design Development Option case; e. Development Review Board (DRB) case; and/or, f. Any other relevant case number for reviews or modifications that affect the site. The following site is subject to the following: 5.12.9. GREATER INFILL INCENTIVE SUBDISTRICT (GIIS) Section 7.6, Landscaping and Screening a. Section 7.7, Native Plant Preservation may not be modified. b. Except as required by Section 5.12.8.B, Development Transition Standards, a complete or partial exception to Section 7.6, Landscaping and Screening Standards, may be granted if shade is provided for pedestrians and customers, such as along sidewalks, pedestrian circulation paths, and outdoor patios, in accordance with Section 5.12.6.A.2. The landscaping requirement may also be waived by the PDSD Director based on a written finding that the waiver is necessary to preserve the prevailing setback. c. Any one or more of the following types of landscaping and improvements may be used to comply with this section: (1) Existing landscaping; (2) Shade trees in the right-of-way; (3) Green walls or green roofs; and/or (4) Shade structures, such as awnings. Provide GREATER INFILL INCENTIVE SUBDISTRICT approval or written PDSD Director waiver and any conditions imposed. Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval. Additional comments may apply

Additional DSD Landscape Comments:
1. Provide dimensions of landscape at grade planter areas where trees are planted adjacent to parking. Some do not appear to meet the SF requirement.

David Marhefka
da’-vid mär-hef’-ka
Landscape Architect
City of Tucson
Department of Transportation
(o) 520-837-6618, (m) 520-403-5074
07/08/2019 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change UNIFIED DEVELOPMENT CODE
4.1 Identification and Descriptive Data
A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.
The Development Package will contain the following identification in the lower right corner of each sheet:
Any relevant case numbers for reviews or modifications that affect the site.
Add case # T19SA00233 to all sheets.
The following site is subject to the following:
5.12.9. GREATER INFILL INCENTIVE SUBDISTRICT (GIIS)
Section 7.6, Landscaping and Screening
Except as required by Section 5.12.8.B, Development Transition Standards, a complete or partial exception to Section 7.6, Landscaping and Screening Standards, may be granted if shade is provided for pedestrians and customers, such as along sidewalks, pedestrian circulation paths, and outdoor patios, in accordance with Section 5.12.6.A.2. The landscaping requirement may also be waived by the PDSD Director based on a written finding that the waiver is necessary to preserve the prevailing setback.
Provide GREATER INFILL INCENTIVE SUBDISTRICT approval or written PDSD Director waiver and any conditions imposed.
Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval.
Additional comments may apply.
07/08/2019 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Reqs Change ("PimaCo Addressing review, 07.08.19" document can be viewed on PRO in the "Documents" section)

DP17-0249 / 2nd submittal for review / The Flash is Conditionally Approved by Pima County Addressing subject to the following minor correction in the title block:

Also please note the Buildings will be addressed as follows:
Building #1: 834 S 6th Av
Building #2: 844 S 6th Av
Building #3: 902 S 6th Av
all other addresses will be retired

Please let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV, 4th Floor, Tucson, AZ 85701
(520) 724-7570
07/09/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: The Flash - Multi-Use Development / Multifamily, Commercial, Office and Retail
Development Package (1st Review) - 834 S. Sixth Avenue
DP17-0249 - C-3 Zoning

TRANSMITTAL DATE: July 8, 2019
DUE DATE: July 10, 2019

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 11, 2020.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

***Please address the "Follow Up Comments" only and any new comments noted under the standards. (The standard section number and standard statements have been left as reference for the applicant and reviewer.)

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

1. Follow Up To Previous Comment 3: Revise general note 3 of the cover sheet to include the use names listed under table 5.12-GIIS-1 as follows; Commercial Use group - Food Service, (any other type of commercial use that may be provided), Residential Use Group - Multifamily Dwelling, and Retail Use Group - Define which use under the retail trade is proposed. See table .12-GIIS-1 for the Uses list.


2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any.

2. Follow Up To Previous Comment 4: It is acknowledged that the T17SAxxxx will be listed on the DP sheets once the case number has been assigned.


2-06.4.7.A.6.b - If there is more than one lot within the site, the note should specify which lots are affected by the additional applications or overlay zones.

3. Follow Up To Previous Comment 5: Add on the plan that the north and south parcels for this development are affected by the GIIS T17SAxxxx case.

List the GIIS case number in general note 5.


2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements.

4. NEW COMMENT: Revise the parcel distances and measurements to match the new boundary of the combined parcel on the north and south.


2-06.4.9.E - Proposed land splits or existing lot lines shall be drawn on the plan with dimensions and the identification number and approximate square footage of each lot. (Please be aware that, if land division occurs and the number of lots falls within the definition of subdivision, a subdivision plat is required.) Land splits require a separate permit and review.

5. Follow Up To Previous Comment 11: A Pima County Tax Parcel Combo will also be required for the development on the south side of 19th street. Provide the combo documents on the next submittal of the DP.


2-06.4.9.H.2 - Show future and existing sight visibility triangles. On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section.

6. Follow Up To Previous Comment13: The SVTs on 6th Avenue adjacent to the south parcel need to be revised. There is no bus lane south of 19th Street except for a bike lane which is approximately 5 feet wide.


2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

7. NEW COMMENT: The back-up spur adjacent in the north parking lot is incorrect. The width must be the same as the PAAL, 24 feet, revise the back-up spur as required.


2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

8. Follow Up To Previous Comment 15: The GIIS application and modifications must be approved through the process and the date any conditions of the approval must be listed on the DP. (It is acknowledged that the proposed modifications have been listed, Zoning will review the director's decision once the process has been completed and the GISS documents are included with the next submittal.)

The landscape modification proposed ion the DP will be evaluated on the next submittal to verify compliance with the Directors Decision and any conditions of the GIIS approved.


2-06.4.9.H.5.b - If any of the required parking is located off-site as permitted by the UDC, a drawing of that parking area is to be provided, together with the city's required parking agreement (include a copy of the lease agreement if applicable) must be provided. Please remember that in these situations, if the off-site parking location is a new parking area, it must comply with all parking area requirements and must be allowed as a principal use by the zoning classification of that property. If the off-site parking area location is an existing parking lot, the parking spaces utilized for the proposed land use must be non-required parking for the existing use for which the parking area was established.

9. Follow Up To Previous Comment 22: The off-site parking will be evaluated on the next submittal to verify compliance with the director's decision and conditions of the GIIS approval.


2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

10. Follow Up To Previous Comment 23: Include a fully dimensioned detail drawings of the short term bicycle parking facilities specific to the proposed locations to assure that the facilities have been designed in compliance with Section 7.4.9.C.


2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown.

11. Follow Up To Previous Comment 27: The building setbacks for building 3 could not be verified on the Site Plan-Sheet 3. Label the building setbacks along all four sides of the building.

It also appears that building 2 has been reduced in size; label the new building setback to the west property line from the new building wall location.


2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

12. Follow Up To Previous Comment 28: The buildings square footage and heights were not labeled within the building footprints as requested in the previous comment and as required by the standard above. Add the information for all buildings.


2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

13. Follow Up To Previous Comment 30: Depict on the accessible ramp adjacent to the ADA parking spaces adjacent to the south side of Building 3.

Include a keynote on the site plan and grading sheets for the sidewalks cross and longitudinal slopes; Max Cross slope is 2% and Max Longitudinal Slopes is 5%


2-06.4.9.T - Show refuse collection areas, including locations of dumpsters, screening location and materials, and vehicle maneuverability, fully dimensioned, and access route. If dumpster service is not proposed, indicate type of service. For specific information on refuse collection, refer to Section 8-01.0.0, Solid Waste and Recycle Disposal, Collection, and Storage, of the Technical Standards Manual. Refuse collection on all projects shall be designed based on that section, even if collection is to be contracted to a private firm.

14. New Comment: Where are the refuse collection areas for both sites proposed?


2-06.4.9.V - For gang mailboxes indicate location to assure there are no conflicts with other requirements, such as pedestrian accessibility, utilities, and landscaping.

15. New Comment: Indicate if gang mailboxes are proposed for this development or if there is a specific area in one of the buildings that will be utilized to have mail delivered. If gang mailboxes are proposed draw and label the location and assure that it is on accessible route.


2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required.

16. New Comment: Draw and label any proposed free standing monument signage and add a general note that states that signage will be permitted under separate permit.



If you have any questions about this transmittal, Contact David Rivera on Tuesday, or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
07/12/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change DP17-0249
1. Sixth Avenue is an arterial. Use the correct dimensions for the SVT's along 6th Avenue. (Near side 125; Far side 340 from the local street; Near side 345; Far Side 125 from the PAAL.)
2. Show the SVT's for each PAAL/Driveway location.
3. Revise the parking area grades to maximize water harvesting. Provide curb cuts to allow water into the landscape areas.
4. The driveway from Stone Avenue must be provided with curb returns with 25-foot radii.
07/16/2019 DAVID RIVERA ZONING HC REVIEW Reqs Change See Zoning Comments.
07/17/2019 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved Regional Traffic Engineering has no comments on this submittal and supports its acceptance. The proposed location will have no impacts to any ADOT facilities. Thank you .
Tom Martinez
tmartinez@azdot.gov
ADOT
07/18/2019 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved (The two TEP documents mentioned here can be viewed on PRO in the "Documents" section)

WR#6206963 July 18, 2019
SUBJECT: The Flash, DP17-0249

Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted June 13, 2019. It appears that there are possible ovehead conflicts with the existing facilities within the boundaries of this proposed development.

I UNDERSTAND THAT A MARKUP FOR THIS 2ND SUBMITTAL WAS NOT REQUIRED BY TEP, I JUST WANTED TO MAKE SURE EVERYONE HAS THIS CHECK IN THEIR FOLDERS SINCE THE LAST REVIEW WAS (DECEMBER 2017): No substantial conflicts. However, there may be clearance/height conflicts with the existing utility line. Due to the buildings close proximity to the existing power line, make sure to keep the minimum approach distances. Any removal/relocation costs due to clearance issues, customer request, or conflicts, will be borne by the customer. notes are on page 5 of the dev. plan.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans.

If easements are required, they will be secured by separate instrument. Your final plans should be sent to:
Tucson Electric Power Company, Attn: Mr. Richard Harrington, New Business Project Manager, P. O. Box 711 (DB101), Tucson, AZ 85702, 520-917-8726

Should you have any technical questions, please contact the area Designer, Steve Doniere, at (520) 918-8275.
Sincerely,
Linda Metzer, Office Support Assistant, Design/Build
cc: Sharon Beasley, City of Tucson (email), S. Doniere, Tucson Electric Power
07/23/2019 NROSS1 DESIGN PROFESSIONAL REVIEW Reqs Change IID design review pending. Applicant must first get Determination of Eligibility from SHPO on the Flash building.
07/24/2019 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson parks and Recreation facilities are affected by this development.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation, (520) 837-8040
Howard.Dutt@tucsonaz.gov
07/24/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.

Fee Balance: $401.64. See image below - Balance column.
NOTE: We now accept payments online (Visa, MC, Discover, American Express) - for some permits, but not all. You may still pay in person or send in a check.
IMPORTANT: City staff cannot view your online payments. All data and transactions are securely encrypted. If paying online, send us a copy of the receipt with your next upload.

Link to Online Payments:
https://www.tucsonaz.gov/pdsd/online-resources-fees-maps-records
1. There is no cost to the customer for using the online payment portal.
2. Not case-sensitive but a hyphen is needed, e.g.: dp19-0000
3. Simply type in your Permit Nbr. and press enter on your keyboard.
4. If any issues, try using the browser Internet Explorer.

Please pay the total fees, or Review Fees at a minimum, at the permit counter (Mon-Fri, 8:00 AM to 2:00 PM) or mail a check (payable to City of Tucson – address is shown below) prior to the completion of the first review. Include the Activity Number on your check.
Permit/Activity Number: DP17-0249
Description: SITE/GRADING/ IID - The Flash, 30-unit apt. project.
Project Manager: John.VanWinkle@TucsonAz.gov, (520) 837-5007

For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number.
(If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
Please name your 3rd submittal documents accordingly, for example: 3_Plan_Set.
Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (listing your response to reviewer's comments)
2) Complete Plan Set (all pages, full set)
3) Any other items requested by review staff
At resubmittal, the plans will enter another 20-working-day review cycle.
Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
07/24/2019 SBEASLE1 OUT TO CUSTOMER Completed