Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP17-0225
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/30/2017 | QJONES1 | START | PLANS SUBMITTED | Completed | |
| 11/01/2017 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Principal Planner PROJECT: Brakemasters Speedway & Silverbell Development Package (2nd Review) DP17-0225 TRANSMITTAL DATE: December 1, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is September 10, 2018. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 1. These easements will need to be abandoned prior to approval of the development package. 2-06.4.8.B - Sheet 4 Utility View there are two easements shown running under the proposed building. These easements will need to be abandoned prior to approval of this development package. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. Based on your response to this comment this BrakeMax is part of the overall center. That said per AM 2-06.4.7.A.8.d - When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. Provide all applicable calculations for the entire site. Also provide a copy of the CC&Rs with your next submittal. 2-06.4.9.H.5.a - The vehicle parking space calculation is not correct. 3840/300 = 12.8 or 13 required. Zoning acknowledges the use of UDC Article 7.4.5.2.b for a reduction of one (1) vehicle parking spaces bringing the number required to 12. A board of adjustment for variance will be required. Once the above comments are addressed Zoning will provide an over-the-counter review. Call or email to schedule and appointment for this review. If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 11/01/2017 | SSHIELD1 | ZONING HC | REVIEW | Passed | |
| 11/02/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 11/09/2017 | JVINCEN1 | COT NON-DSD | FIRE | Approved | |
| 11/17/2017 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approv-Cond | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT COMMENTS Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT DP17-0225 Brake Masters Speedway & Silverbell 11/17/2017 () Final Plat (X) Development Plan () Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other - Elevations SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: (X) Conditionally Approved (X) Rezoning history on site () Denied () Annexation history on site () No Rezoning history on site - No Resubmittal Required: () Tentative Plat () Landscape Plan () Other REVIEWER: MM DATE: 11/17/2017 COMMENTS Site is addressed 1714 W Speedway Boulevard and is currently being reviewed for DP17-0225. Site has rezoning history to monitor per development package checklist, which indicates rezoning conditions do apply. Brake Masters on Speedway and Silverbell is subject to rezoning C9-16-11. " For condition #7 of Land Use Compatibility, please correct word UOG to JOG on sheet 2 of 12. |
| 11/22/2017 | ANDREW CONNOR | NPPO | REVIEW | Reqs Change | Identify the 8 trees on the NPP plan to satisfy re-zoning condition #11 |
| 11/22/2017 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | UNIFIED DEVELOPMENT CODE 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. The landscape plan will contain the following: Demonstrate on the landscape plans how re-zoning conditions 11 & 12 have been met. Identify the 8 trees on the landscape plan to satisfy condition #11 Change note #3 on Water Harvesting plan to indicate 12" to satisfy condition #12 Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval. Additional comments may apply. |
| 11/29/2017 | KELLY LEE | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
| 11/29/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Provide clearances from all affected utilities and record abandonments for the easements. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/18/2017 | QJONES1 | APPROVAL SHELF | Completed |
| 12/18/2017 | QJONES1 | OUT TO CUSTOMER | Completed |
| 12/18/2017 | QJONES1 | REJECT SHELF | Completed |