Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP17-0157
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/25/2017 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
08/28/2017 | ALEXANDRA HINES | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | |
08/29/2017 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
08/30/2017 | ALEXANDRA HINES | PIMA COUNTY | WASTEWATER | Approved | REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (520) 724-6500 DIRECTOR FAX: (520) 724-9635 DATE: August 28, 2017 TO: Kevin Hall, P.E. Cypress Civil Development ____________________________________ From: Hussein Al Zubaidi, RWRD (520) 724-6404 SUBJECT: Cherrybell Medical Center P17WS00062 PSL - 2nd Submittal Review Comments The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer design for the above-referenced project. The Pima County Regional Wastewater Reclamation Department hereby approves the above referenced submittal of the Preliminary Sewer Layout (PSL), based upon PCRWRD Engineering Design Standards (EDS) 2016. If you have any questions regarding this matter please contact me at your convenience. Cc: Lorenzo Hernandez, P.E. Tom Porter, P.E. Francisco Galindo, P.E. |
08/30/2017 | ALEXANDRA HINES | PIMA COUNTY | ADDRESSING | Approved | DP17-0157 El Rio-Cherrybell Medical Center / 2nd Submittal is Approved by Pima County Addressing. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
09/06/2017 | DAVID RIVERA | ZONING HC | REVIEW | Approv-Cond | see zoning review comments |
09/06/2017 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | TO: Development Services Department Plans Coordination Office FROM: David Rivera for Steve Shields - Principal Planner PDSD Zoning Review Section PROJECT: Cherrybell Medical Center - El Rio Development Package (2nd Review) DP17-0157 (Medical Services Outpatient / Residential Care Services Physical and Behavioral Health Service) TRANSMITTAL DATE: September 6, 2017 DUE DATE: September 25, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is June 29, 2018. 1. Follow up Comment to Previous Comment 12: After consulting with the building official, a passenger loading zone shall be required for the Residential care facility, per IBC section 1106.7.2. See section 503 in the ICC A117.1-2009 for information related to location and dimensional standards etc. The loading zone shall be provided at the accessible entrance location. (An accessible ramp to the sidewalk and accessible route will be required.) 2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC. PREVIOUS COMMENT 12: The overall vehicle parking calculation will be reviewed again once the phase II use is clarified. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
09/14/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
09/15/2017 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | 7.6. LANDSCAPING AND SCREENING The following comments were not posted from previous review because the design of stabilized path and building have changed. Street Landscape Borders Street landscape borders must be a minimum of ten feet wide as measured from the street property line. Portions of street landscape border along Kino Parkway is not 10' wide. Stabilized path cannot be included in width calculation and it appears the building is encroaching into landscape buffer Vegetative Ground Cover Fifty percent or more of the area of the street landscape border must be covered with shrubs or vegetative ground cover. Portions of Kino Parkway buffer does not meet coverage calculations. |
09/29/2017 | KELLY LEE | ZONING-DECISION LETTER | REVIEW | Reqs Change | |
09/29/2017 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 September 27, 2017 WR# 6197564 DSD_CDRC@tucsonaz.gov richardgs@elrio.org Dear Richard SUBJECT: El Rio Cherrybell - Medical Center 1538 E 22nd St DP17-0157 Tucson Electric Power Company has reviewed and approved the development plan. There are existing facilities in conflictand have conditional approval. TEP and the project have met to resolve the clearance issues identified under the 1st submittal. This issue has been addressed to the satisfaction of all parties. The 1st submittal did not include the landscape plans which pose new issues. TEP has conflicts with some of the proposed trees to be planted under TEP's power lines. Trees should not be planted near TEP lines that could encroach within 10' vertical or 10' horizontal of the existing line. The OHE identified on the plans denotes centerline and the wires run 5' out from the pole on either side. TEP will conditionally approve the development plan provided the landscape plan be adjusted to meet these requirements. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Billiable relocation will require easements. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Rich Harrington New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8726 For additional resources visit https://www.tep.com/vegetation-management/ or contact the TEP Designer Steve Garcia at 917-8739. Sincerely, Beth Shelton Elizabeth "Beth" Shelton Admin Assistant, Design |
12/07/2017 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | El Rio Health Center is addressed 1538 East 22nd Street and is currently being reviewed for DP17-0157. El Rio Health Center is conditionally approved pending approval by Mayor and Council October 24, 2017 for rezoning conditions C9-017-09 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/07/2017 | KROBLES1 | REJECT SHELF | Completed |