Permit Number: DP17-0123
Parcel: 11450022D

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Permit Number - DP17-0123
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/20/2017 ARUIZ1 START PLANS SUBMITTED Completed
10/04/2017 ALEXANDRA HINES UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the attached revised Tentative Plat submitted to TEP by Perry Engineering on 10-3-17. The revision was to correct the easement label for Dkt 13016 Pg 1090 on Sheet 1 of the plat.

If you have any questions, please contact me at 520-917-8744.

Thank you,

Mary Burke
Right of Way Agent III
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road
Tucson, AZ 85714-2114
Office - 520-917-8744
Cell - 520-401-9895
mburke@tep.com
10/11/2017 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Steve Shields - Principal Planner
PDSD Zoning Review Section

PROJECT: Tentative Plat for Murphy's Lots 1 and 2
Development Package (2nd Review)
DP17-0123 (Zoning is SR)

TRANSMITTAL DATE: October 11, 2017

DUE DATE: October 18, 2017

COMMENTS: Conditional Approval

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 26, 2018.

1. Follow Up To Previous Comment 5: The building setback from the new west line to the existing dwelling was not added as requested. Add the building setback dimension on sheet 2, see redlines.

2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown.

PREVIOUS COMMENT 5: Label on sheet 2, the proposed building setbacks from the new property line to the chicken coop and the house. The minimum interior building setback in the SR zone is 25 feet.
10/17/2017 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Revise note 24 to include both lots. Both lots are within the flood hazard area.
2. This correction will be reviewed over the counter if desired.
10/18/2017 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change 1) Two rolled sets of the plans
2) All approved documents submitted previously
3) All items requested by review staff
4) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
10/19/2017 ARUIZ1 OUT TO CUSTOMER Completed