Permit Number: DP17-0110
Parcel: 13609012B

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Permit Number - DP17-0110
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/25/2017 KROBLES1 START PLANS SUBMITTED Completed
07/28/2017 KLEE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed Plat is less than 6 lots and within Tucson Water Service Area.
08/01/2017 DAVID RIVERA ZONING HC REVIEW Approved
08/01/2017 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Steve Shields - Principal Planner
PDSD Zoning review Section

PROJECT: Commercial Business Park
Development Package (2nd Review)
DP17-0110 - (Uses - General Merchandise, Financial Service, Food Service)

TRANSMITTAL DATE: August 1, 2017
DUE DATE: August 22, 2017

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 8, 2018.

2-06.3.0 FORMAT REQUIREMENTS

1. Follow Up To Previous Comment 1: The title block on sheets 6-13 were not revised to match the title block on the DP sheets, see redlines.

PREVIOUS COMMENT 1: 2-06.3.4 - The information in the title block related to this development shall be consistent on all plan sheets. Revise the title blocks to include the same information.

2. Follow Up To Previous Comment 6: See related comment 1 above.

PREVIOUS COMMENT 6: 2-06.4.2, 2-06.4.2.A, 2-06.2.B, 2-06.2.C - List the text information listed on the top of the cover sheet in the title block of all plan sheets. (See redlines on cover sheet.)

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes


3. Follow Up To Previous Comment 19: revise the number of long term bicycle parking facilities provided. There are eight spaces list on the drawing but the calculation only lists six. Revise as required.

PREVIOUS COMMENT 19: 2-06.4.9.H.5.d - The short and long term bicycle parking is to be provided based on each individual use, i.e., Financial Services, Food Service and Retail. Revise the bicycle parking calculations to correctly list the number of short and long term facilities required and provided for each use.

Draw and label the public entrances to the buildings in order to verify if the short term facilities are within 50 feet. If the building on lot 2 is to be designed with multiple suites and public entrances the short term facilities may have to be split up in order to meet the 50-foot distance.

Draw and label the required long term bicycle parking facilities for the three buildings. Review UDC section 7.4.9.D for location, security requirements, signage and lighting.


4. Follow Up To Previous Comment 24: Clarify if an additional DP is to be submitted for each lot. If so a general note stating the requirements shall be added on the cover sheet.

PREVIOUS COMMENT 24: 2-06.4.9.U - It is possible from my conversation with John Beall that the current rezoning conditions may be revised, some eliminated and possibly new ones added. Given that, provide a separate response memo detailing how the current rezoning conditions have or will addressed whether on the DP or building plans. Also, if the current rezoning conditions are modified assure that the rezoning conditions are addressed on the DP and include the information on the separate response memo.


The following comments are related to SCZ requirements and applicable SCZ notes. (A separate sheet demonstrating compliance with the SCZ may be required.)

5. Follow Up To Previous Comment 28: The view corridor location(s) could not be verified on the plan. Draw, label and dimension the corridors on DP 2.

PREVIOUS COMMENT 28: UDC 5.3.6.B - View corridors are required to be provided on sites with a 200-foot or greater street frontage. Provide a calculation for the view corridors requirements and demonstrate on the plans compliance with section 5.3.6.B


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
08/02/2017 ALEXANDRA HINES PIMA COUNTY WASTEWATER Approved August 1, 2017

To: Nathan Cottrell
PHYSICAL RESOURCE ENGINEERING.
____________________________________
From: Hussein Al Zubaidi, RWRD (520) 724-6404

Subject: Commercial Business Park - 1201 S Houghton Rd
P17WS00046
PSL-2nd Submittal

The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer design for the above-referenced project. The Pima County Regional Wastewater Reclamation Department hereby approves the above referenced submittal of the Preliminary Sewer Layout (PSL), based upon PCRWRD Engineering Design Standards (EDS) 2016.

If you have any questions regarding this matter please contact me at your convenience.

Cc. Lorenzo Hernandez, P.E., RWRD
Tom Porter, P.E., RWRD
Francisco Galindo, P.E., RWRD
08/02/2017 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved DP17-0110 Commercial Business Park / 2nd Submittal is Approved by Pima County Addressing.

Thank you,

Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
08/11/2017 JOE LINVILLE LANDSCAPE REVIEW Reqs Change 1) Revise the plans as necessary to conform to any applicable conditions of rezoning. Include a transmittal that explains how the conditions are met. C9-07-18 still has an expired status in our system.


2) Revise the Development Plan to the include the NUOS. NUOS is defined as "An area of land that is unimproved and not occupied by structures or man-made impervious surfaces and includes environmentally significant features (as identified in the Environmental Resource Zone; Hillside Development Zone; and, Watercourse Amenities, Safety and Habitat zone), culturally significant features (features eligible for National Register status as identified during the cultural resource assessment process), or designated floodplains.

The plat is required to show the set aside area in a surveyable manner. AM 2-10.4.5

See also TSM 4-02.2.6.D regarding requirements for legal protection of protected riparian areas and incorporate the required legal protection.

3) Provide the required dedication for the Este Wash Trail per C9-07-18 and show the location on the Development plan. Consult with COT Parks and Recreation for the appropriate location for trail improvements, which may need to be outside of the floodplain limits. Provide for connection with Houghton Greenway.
08/14/2017 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
08/16/2017 PCDS ENGINEERING REVIEW Reqs Change 1. Provide drafts of cross-access and maintenance agreements for parking and vehicle and pedestrian access areas.
2. Include drainage facility inspection and maintenance requirements and in drainage report.
08/16/2017 MMORENO1 COT NON-DSD COMMUNITY PLANNING Approved Conditionally approved pending approval by Mayor & Council for the proposed preliminary rezoning conditions for case C9-07-18
08/17/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
08/17/2017 JANE DUARTE COT NON-DSD PARKS & RECREATION Approved Previous Tucson Parks and Recreation comments have been adequately addressed. Tucson Parks and Recreation recommends approval.



Howard B. Dutt, RLA

Landscape Architect
Tucson Parks & Recreation
(520) 837-8040

Howard.Dutt@tucsonaz.gov
08/21/2017 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR

TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Julieann Arechederra
GIS Cartographer
Pima County Assessor's Office

DATE: August 21, 2017

RE: Assessor's Review and Comments Regarding: COMMERCIAL BUSINESS PARK DP17-0110 (2nd TENTATIVE)

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Plat meets Assessor's Office requirements.
___X___ Plat does not meet Assessor's Office requirements.

COMMENTS:

" THE TITLE BLOCK MUST BE IN THE LOWER RIGHT HAND CORNER. IT MUST HAVE THE NUMBER OF LOTS OR UNITS OR BLOCKS OR ANY COMBINATION OF THESE. IT MUST HAVE THE COMMON AREAS LISTED, IF THERE ARE ANY. IT MUST HAVE THE SECTION, TOWNSHIP AND RANGE AND IF IT IS A RESUBDIVISION, IT MUST MENTION THE PLAT NAME AND THE MAP AND PLAT.

" GENERAL NOTES MUST HAVE THE NUMBER OF LOTS, THE NUMBER OF MILES OF NEW ROAD, PUBLIC AND PRIVATE, EVEN IF THE NUMBER IS 0, AND THE BASIS OF BEARING.

" THERE MUST BE APPROXIMATE DIMENSIONS FOR THE PERIMETER AND ALL LOT LINES AND ALL COMMON AREAS. (TENTATIVE PLAT)

" OUR RECORDS SHOW STEWART TITLE & TRUST TR 3284, ATTN: SOUTHWEST VALUE PRTNRS HOLDINGS. YOUR RECORDS INDICATE BASELINE CONSTRUCTION INC TUCSON DEVELOPMENT GROUP AS OWNERS/DEVELOPERS. PLEASE VERIFY CORRECT OWNERS.

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
08/21/2017 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
08/22/2017 KROBLES1 OUT TO CUSTOMER Completed