Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP17-0100
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2018 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | FROM: Steve Shields - Principal Planner PDSD Zoning Review Section PROJECT: Parking Addition for Penske Truck Leasing Development Package (4th Review) DP17-0100 TRANSMITTAL DATE: January 2, 2018 DUE DATE: January 3, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 25, 2018. CONTENT REQUIREMENTS 1. This comment was not addressed. Remove all clouds from the drawing. This plan has not been approved and the changes necessary for approval are not considered revisions. 2. This comment was not addressed. It appears that the reference site plan on the cover sheet is labeled with the incorrect scale. The drawing appears to be drawn at a scale of 1:40 and not 1:60. Correct the drawing scale information for the reference site plan. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 8. This comment was not addressed. Zoning was not able to find a short & long term bicycle calculation within the vehicle parking calculation as stated within your response letter. Clearly demonstrate how these requirements are met. The bicycle parking requirements for this development is 2 Short and 2 Long Term bicycle spaces. Add the bicycle parking calculations under the Parking Data section of the cover sheet. List the number of each required and number provided. Provide a fully dimensioned detail drawing of the short and long term facilities based on the location and proposed types of facilities for this development. Previous comment 10/27; (This comment was not addressed correctly. Short and Long Term bicycle parking requirements are based on UDC Article 7.4.8 and Table 7.4.8-1, COMMERCIAL SERVICES USE GROUP, Trade Service and Repair, Major. Per UDC Article 7.4.3.2 the ratio used should be based on the standard formula listed for the COMMERCIAL SERVICES USE GROUP or 2 short & 2 long term bicycle parking spaces required. 2-06.4.9.H.5.d - - Provide a short and long term bicycle parking space calculation on the plan. The calculation should include the ratio used, number required, number provided,) 12. This comment was not addressed correctly. The long term bicycle parking shown on detail 6 sheet A1-1 does not meet the requirements of UDC Article 7.4.9.D.2, .3 & .5. Demonstrate and annotate the location of the long term bicycle facility. Include a fully dimensioned detail drawing for the long term facility based on the proposed location and type. Previous Comment 15; (2-06.4.9.H.5.d - Provide a long term bicycle parking space detail that clearly demonstrates how the requirements of UDC Articles 7.4.9.B.1, .2 & 7.4.9.D are met.) If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
01/03/2018 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | The following comments were not addressed from the previous reviews: Landscape location on site: Street landscape borders must be located entirely on site, except that, if approved by the City Engineer or designee. Use of the Public Right-of-Way Nonrequired landscaping may be placed in the public right-of-way, if the following standards are met: 1. The landscaping is approved by the City Engineer or designee and complies with the City Engineer's standards on construction, irrigation, location, and plant type; 2. All vegetation complies with the standards of Section 7.6.4, Landscaping Standards; and, 3. The landscaping does not interfere with the use of the sidewalk. Obtain permission for required and non-required landscaping from: Gary Wittwer Landscape Architect Transportation Department 520-837-6618 Gary.Wittwer@tucsonaz.gov Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval. |
01/03/2018 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
12/04/2017 | ARUIZ1 | START | PLANS SUBMITTED | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/16/2018 | ARUIZ1 | OUT TO CUSTOMER | Completed |