Review Date Reviewer's Name Type of Review Description Status Comments
04/28/2017 MMENDIB1 START PLANS SUBMITTED Completed
04/28/2017 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Passed For information purpose only
04/28/2017 DAVID TAKAKI OTHER AGENCIES PIMA ASSN OF GOVTS Passed For information purpose only
04/28/2017 DAVID TAKAKI UTILITIES SOUTHWEST GAS Passed For information purpose only
04/28/2017 DAVID TAKAKI OTHER AGENCIES U. S. POST OFFICE Passed For information purpose only
05/03/2017 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Principal Planner

PROJECT: Parking Addition for Penske Truck Leasing
Development Package (1st Review)
DP17-0100

TRANSMITTAL DATE: May 03, 2017

DUE DATE: May 24, 2017

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 25, 2018.


1. As the proposed project is an expansion of the existing Penske Truck Leasing site and the expansion of site area is greater than 50% the entire site including the existing should be included on the plan. Also all calculations should address the existing and proposed.

2-06.3.0 FORMAT REQUIREMENTS

2. 2-06.3.5 - Provide the PDSD Development Package approval stamp in the lower right quadrant of sheets 1, 2, 9, 10 & 11. The required stamp can be found at http://pdsd.tucsonaz.gov/pdsd/development-permits under Development Package.

CONTENT REQUIREMENTS

3. 2-06.4.1 - Provide the following information for the Civil and Landscape engineers on the cover sheet; name, mailing and email addresses, and phone number shall be provided on the right half of the cover sheet.

4. 2-06.4.2.B - Provide a brief legal description within the title block on all sheets.

5. 2-06.4.3 - Remove the address from the title block and provide a single administrative address adjacent to the title block on each sheet.

6. 2-06.4.3 - Provide the development package case number, DP17-0100, adjacent to the title block on all sheets.

7. 2-06.4.3 - Provide the rezoning case number, C9-70-75, adjacent to the title block on all sheets.

8. 2-06.4.4 - The location map on the cover sheet should be drawn at a minimum scale of three inches equals one mile and cover approximately one square mile.

9. 2-06.4.4.A - Show the subject property approximately centered within the one square mile area of the location map.

10. 2-06.4.4.B - - Identify major streets and regional watercourses within the square mile area of the location map.

11. 2-06.4.4.C - Identify the section, township, and range; section corners; and the scale on the location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

12. 2-06.4.7.A.2 -The gross area of the site should include the existing Penske area.

13. 2-06.4.7.A.4 - The existing and proposed use should be listed as TRADE SERVICE AND REPAIR MAJOR SUBJECT TO USE SPECIFIC STANDARDS 4.9.4.X.1 and 4.9.13.Q.

14. 2-06.4.7.A.6.a - Provide a general note on the cover sheet stating "THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.6 AIRPORT ENVIRONS ZONE (AEZ)."

2-06.4.7.A.8 - For development package documents provide:

15. 2-06.4.7.A.8.a - Floor area for each building

16. 2-06.4.7.A.8.b - As the site is located within the Davis Monthan AFB Environs zone, Approach Departure Corridor 1 provide a floor area ratio calculation on the plan that meets the requirements of UDC Article 6.4.6.

17. 2-06.4.7.A.8.c - Provide a lot area and vehicular use area expansion calculation on the plan.

18. 2-06.4.7.A.8.d - When the proposed site is part of a larger site, the calculations encompass the entire site.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

19. 2-06.4.8.A - Sheet 2 you reference "L1, L2 & L3" but no line table is provided. Either provide a line table or the site boundary information for these lines.

20. 2-06.4.8.B - Provide the recordation information for all existing easements shown on the plan.

21. 2-06.4.8.C - Provide the following information for 34th Street on the plan, dimensioned width of paving, curbs, curb cuts, and sidewalks.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

22. 2-06.4.9.E - As the overall site consists of four (4) parcels, 130-13-016B, 130-13-016C, 130-13-068A & 130-13-069A a lot combination is required. Provide a copy of the approved Pima Combination Request form with your next submittal.

23. 2-06.4.9.F - Provide all existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) on the plan with zoning boundaries clearly defined.

24. 2-06.4.9.H.2 - Show the required sight visibility triangles on the plan.

25. 2-06.4.9.H.5 - Provide width dimensions for the two (2) driveways off of 34th Street.

26. 2-06.4.9.H.5.a - Provide a vehicle parking space calculation on the plan. The calculation should include the ratio used, number required, number provided, accessible required and provided.

27. 2-06.4.9.H.5.d - - Provide a short and long term bicycle parking space calculation on the plan. The calculation should include the ratio used, number required, number provided,

28. 2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

29. 2-06.4.9.R - Show existing on-site pedestrian circulation on the plan.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
05/03/2017 SSHIELD1 ZONING HC REVIEW Approved
05/05/2017 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: May 9, 2017
DUE DATE: May 24, 2017
SUBJECT: Truck Storage Asphalt Parking Lot
TO: Lew Kaplan
LOCATION: 3525 and 3579 E 34th Street
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: DP17-0100
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) Per AM 2-06.4.3 please add the case number (DP17-0100).
2) Add checklist to drainage report to show how each item contained in UDC 7.14.4, Section 14.5 is being complied with.
3) TTG Standard Engineering note 3 refers to a geotechnical report that per TSM 2-01.4.1.C.6 needs to be provided with the next submittal. Please note that there is a discrepancy between Pavement Section 1 on sheet 1 and construction keynote 3 on sheet 5 that both refer back to this geotechnical report. Please provide report and update plans in accordance with its recommendations.
4) Detail 2 on sheet 4 refers to a D50 and thickness per plan. It is not clear where this information is shown on the plan. Please update accordingly.
5) It is not clear how detail 4 on sheet 4 is compliant with UDC 7.14.4, Section 14.5. Please update accordingly to provide a compliant detail.
6) The water harvesting and landscaping shown in the right-of-way as part of section A on sheet 4, construction keynote 10 on sheet 5 and planting plan on sheet 9 requires approval from TDOT. It may be necessary to place the water harvesting and some of the landscaping in the middle two parking islands by the entrances (ie. On private property). TDOT does not generally approve water harvesting in the right of way.
7) References within the Construction Keynotes on sheet 5 to a sheet C2 should be update to refer to sheet 4.
8) The use of Keynote 14 is dependent on the demonstration of compliance with each requirement of UDC 7.14.4, Section 14.5.
9) Grading note 2 on sheet 5 should be updated to reflect a requirement for a double row of silt fence or equivalent protection to provide protection from fines entering the drywell.
10) Per TSM 10-01.3.2C show an 18 foot minimum radius curb return with dimensions shown per AM 2-06.4.8C.
11) Per TSM 10-01.3.3E please add 4 curb ramps at required curb returns.
12) Per AM 2-06.4.8C dimension the sidewalk. Per TSM 10-01.4.1.A.1.b(1) increase the sidewalk width to 5' width if the existing sidewalk is less than 4 ' wide at any location.
13) Per TSM 10-01.4.1.D.1a show a maximum 2% cross slope as either existing or proposed where vehicular traffic crosses the pedestrian way.
14) Move the concrete washout 100 feet away from any water harvesting or retention area on sheet 7.
15) Show linework for a double barrier of silt fence to protect the drywell at the northwest corner of the property from any silt or fines that may not be stabilized until after construction.
16) Planting keynote 7 on sheet 9 calls out a drainage structure with a reference to see the civil plans. This drainage structure is not shown on sheets 4 or 5 and is not detailed in any degree on sheet 2. Please update per AM 2-06.4.9N. The drainage calculations memo is inadequate for this size project and a drainage report meeting the requirements of UDC 7.14.4 should be provided with the next submittal per UDC 7.14.4, Section 2.1.1 since this site is greater than 1 acre.

If you have any comments questions or wish to discuss new information, please call or email Loren Makus at 520-837-4927 or loren.makus@tucsonaz.gov.
05/17/2017 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved Regional traffic Engineering has no comments on this submittal and supports its acceptance.

The proposed use for the development will have no significant impact to adjacent SR-210, Aviation Highway. Thank you.
05/18/2017 ZELIN CANCHOLA COT NON-DSD TRAFFIC Reqs Change May 18, 2017
DP17-0100
Parking Addition Penske
3525 E 34th Street
Zelin Canchola TDOT

The proposed improvements in the right of way are acceptable. However the following will need to be modified on the plan or acknowledged.

Per TSM 10-01.3.2C show an 18 foot minimum radius curb return with dimensions shown per AM 2-06.4.8C. at the proposed driveways.

Per TSM 10-01.3.3E add 4 curb ramps at required curb returns. Use PAG Standards.

Per AM 2-06.4.8C dimension the sidewalk. Per TSM 10-01.4.1.A.1.b(1) increase the sidewalk width to 5' width if the existing sidewalk is less than 4 ' wide at any location.

1. The City of Tucson has adopted the Pima Associates of Government (PAG) 2015 Standard Specification for Public Improvements (SSPI) and Standard Details (SD). Please revise plan set to reflect this change. Use for improvements within the right of way.

If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov
05/22/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/24/2017 JOE LINVILLE NPPO REVIEW Reqs Change Submit a Native Plant Preservation Plan. UDC 7.7.3

Include relevant information on the Landscape Plans. UDC 7.7.5.B
05/24/2017 JOE LINVILLE LANDSCAPE REVIEW Reqs Change 1) Based on the proposed expansion, the provisions of UDC 7.6.2 are applicable. Provide plans of the entire site as applicable.

2) Provide dimensions for the street landscape borders. AM 2-10.4.2.A.2

3) The street landscape border is required to be located fully on the site property, except as allowed per UDC 7.6.4.C.2.c

4) Provide trees in the vehicle use areas per UDC 7.6.4.B.1

5) Additional comments may apply pending submittal of revised plans. AM 2-10.2.0
06/01/2017 MARTIN BROWN FIRE REVIEW Approved
06/02/2017 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans
06/02/2017 ALEXANDRA HINES COT NON-DSD PARKS & RECREATION Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
06/07/2017 KROBLES1 OUT TO CUSTOMER Completed