Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP17-0083
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/06/2017 | ARUIZ1 | START | PLANS SUBMITTED | Completed | |
| 07/11/2017 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 June 23, 2017 WR# 6188339 DSD_CDRC@tucsonaz.gov marty@baetucson.com jean@baetucson.com Dear Marty SUBJECT: The Place at Rio Verde Village Apts 3510 N Craycroft Rd DP17-0083 Tucson Electric Power Company has reviewed and approved the development plan that had previously denied. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Billiable relocation will require easements. Servie at existing phase and voltage can only be relocated overhead. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Rich Harrington New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8726 Should you have any technical questions, please call the area Designer, Susie McCann @ 520-917-8741. Sincerely, Beth Shelton Elizabeth "Beth" Shelton Admin Assistant Design |
| 07/17/2017 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approv-Cond | *Image can be viewed in Documents table on PRO. DP17-0083 The Place at Rio Verde Village Apts / 2nd Submittal is Approved by Pima County Addressing with one small correction requested. MP 30/21 is Rio Verde Vista Lots 1-58…not Rio Verde Vista II. Please correct. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
| 07/20/2017 | KELLY LEE | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Kelly Lee Lead Planner PROJECT: The Place at Rio Verde Village Development Package (1st Review) DP17-0083 TRANSMITTAL DATE: July 20, 2017 DUE DATE: August 3, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 7, 2018. 2-06.4.7.A.8 - For development package documents provide: 1. 2-06.4.7.A.8.a - Please also show Development Area A &B on sheet 2 and 3. 2. 2-06.4.7.A.8.d - PREVIOUS COMMENT STILL APPLIES: Please add an additional row to the parking calculations table that includes density calculations and lot coverage. This is important because this table will be used for all future Rio Verde PAD Development. If you have any questions about this transmittal, please contact Kelly Lee, (520) 837-6999 or Kelly.Lee@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 07/20/2017 | KLEE1 | ZONING HC | REVIEW | Approv-Cond | See Zoning Comments. |
| 07/26/2017 | TIM ROWE | PIMA COUNTY | WASTEWATER | Approved | REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (520) 724-6500 DIRECTOR FAX: (520) 724-9635 DATE: July 25, 2017 TO: Martin V. Magelli, P.E. Baker and Associates Engineering, Inc. FROM: Alan Showalter, EIT Sr. Civil Engineering Assistant, PCRWRD SUBJECT: The Place at Rio Verde Village Apartments P17WS00026 / DP17-0083 DP - 2nd Submittal Review Comments The Pima County Regional Wastewater Reclamation Department (PCRWRD) has performed a second review of the Preliminary Sewer Layout (PSL) for the above-referenced project and hereby APPROVES this PSL submittal based upon the corrections and updates that were made per the first modification review letter. All items have been met satisfactorily. If you should have any questions or concerns, please contact our office accordingly. Respectfully, Alan Showalter, EIT Sr. Civil Engineering Assistant PCRWRD - DLU (520) 724-6341 / Email: alan.showalter@pima.gov Cc: Lorenzo Hernandez, P.E. Tom Porter, P.E. Francisco Galindo, P.E. |
| 07/28/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 07/31/2017 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | |
| 07/31/2017 | KELLY LEE | ZONING-DECISION LETTER | REVIEW | Approv-Cond | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) All items requested by review staff 4) All items needed to approve these plans |
| 07/31/2017 | KLEE1 | LANDSCAPE | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Kelly Lee PROJECT: The Place at Rio Verde Village Development Package (1st Review) DP17-0083 TRANSMITTAL DATE: Monday, July 31, 2017 DUE DATE: August 3, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Landscape Review Section comments were addressed. This may be reviewed over the counter. Please contact me for an appointment prior to submitting. This plan has been reviewed for compliance with Rio Verde Village PAD, the Rio Verde Village PAD amendment, the Unified Development Code (UDC) Administrative Manual (AM) and City of Tucson Land Use Code. General Comments: 1. The previous comment still applies. Please add the limits of disturbance and floodplain limits to the legend of the landscape plan and riparian mitigation plans. PREVIOUS COMMENT: Per Administrative Manual, 2-4.2- All landscape sheets: The line work for Protected Riparian Area versus Floodlines and Disturbance limits is not clear. Please revise the legend and plan to clearly indicate the line work. 2. Add the protected riparian area and proposed protected riparian mitigation areas to the Site Plan Sheets 2-9. |
| 07/31/2017 | KLEE1 | NPPO | REVIEW | Approv-Cond | See Landscape Comments. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/02/2017 | ARUIZ1 | OUT TO CUSTOMER | Completed |