Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP17-0081
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/21/2017 | MMENDIB1 | START | PLANS SUBMITTED | Completed | |
06/23/2017 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Principal Planner PROJECT: Chick-fil-A @ Irvington Commercial Center Development Package (2nd Review) DP17-0081 TRANSMITTAL DATE: June 26, 2017 DUE DATE: July 20, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 05, 2018. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 1. Prior comment 16. As a general not provide the overall PAD site area in square footage and acreage. 2-06.4.7.A.2 - Clarify where the site area square footage came from. Based on the tentative & final plat the site area should be 59,671.3 S.F. The site area should also list the acreage. Also provide the overall PAD site area in square footage and acreage. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2. Prior comment 26. Zoning acknowledges that wheel stops are proposed. Per UDC Article 7.4.6.H.3 and Figure 7.4.6-C When required, wheel stop curbing must be a minimum of two and one-half feet from the front of the parking space. Show the required dimension either on the plan or on the standard and accessible vehicle parking space details. 2-06.4.9.H.5.a - As it appears that you are proposing to allow vehicles to overhang the sidewalk along the east side of the proposed building demonstrate on the plan that you are providing the 4' wide clear sidewalk and the 2'-6" vehicle overhang, TSM 7-01.4.3.A & 7.4.6.H.3. 3. Prior comment 28. This comment was not addressed. Your response to comments states that the detail is provided on sheet 5 but there is no sign detail. 2-06.4.9.H.5.a - Provide a detail for the required accessible vehicle parking space signage. 4. Prior comment 31. This comment was not addressed correctly. Per UDC Article 7.4.9.B.2.f Each required short-term bicycle parking space must be at least two feet by six feet. That said the minimum distance between racks should be 4'-0". The distance between 2-06.4.9.H.5.d - Provide a short term bicycle parking space detail that demonstrates how the requirements of UDC Articles 7.4.9.B.1.e, 7.4.9.B.2.a-h are met. 5. Prior comment 33. This comment was not fully addressed. Per UDC Article 7.4.9.D.4 provide the required signage. Demonstrate on the plan where this signage will be provided. Also sheet 3 has a detail callout of "LONG TERM BICYCLE PARKING RE: 2/SHT. 7", no such detail on sheet 7. 2-06.4.9.H.5.d - Provide a long term bicycle parking space detail that demonstrates how the requirements of UDC Articles 7.4.9.B.1.e, 7.4.9.D are met. 6. Prior comment 36. This comment was not fully addressed. Provide width dimensions for all sidewalks shown on the plan. 2-06.4.9.R - Provide width dimensions for all proposed sidewalks on the plan. Due to vehicles over hanging the sidewalk shown along the east side of the proposed building this sidewalk is required to be 6'-6" wide minimum. Shown the 2'-6" vehicle overhang on the plan. 7. Prior comment 38. 2-06.4.9.R - Clarify why you are showing access ramps near the southeast corner of the proposed building? These ramps give the impression that there is an accessible route that does not exist. 8. Additional comments due to changes to the plan. 9. 2-06.4.9.R - There is a ramp shown along the northern end of the vehicle parking area. Clarify what this ramp is for. 10. 2-06.4.9.R - There appears to be some type of drainage gutter running from the north end of the vehicle parking area south and then west through the parking area. It appears that this gutter runs through the sidewalk shown at the north end of the vehicle parking area. Demonstrate how the sidewalk will cross over this gutter. 11. As this plan differs from development package DP16-0044, DP16-0044 will need to be revised prior to approval of the building plans. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
06/26/2017 | SSHIELD1 | ZONING HC | REVIEW | Reqs Change | See Zoning comments |
07/12/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide the invert and rim elevations of the manholes immediately upstream and downstream of the point of connection to the public sewer. [Initial comment: Revise the site drawing to include the following existing utility information: a. The location of water lines and fire hydrants. b. The location and size of sanitary and storm sewers, including the pipe diameter and the invert and rim elevations of all manholes and cleanouts. c. The points of connection to existing public sewers. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2012.] |
07/14/2017 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
07/20/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. The proposed solid waste container storage location doesn't meet the approved standard TSM 8-01.9. The standard requires 10 feet clear between the bollards protecting the rear of the enclosure and the front of the enclosure. Other requirements are shown in the approved details. 2. Provide the waste stream calculation as described in TSM 8-01.8.0. 3. Clearly identify water harvesting areas and show how flows from hardscaped areas will be directed to these areas. |
07/24/2017 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
07/24/2017 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 July 21, 2017 WR# 6187303 DSD_CDRC@tucsonaz.gov rrobinson@4gdev.com Dear Ryan SUBJECT: Chick-Fil-A 2nd Submittal 1188 W Irvington Rd DP17-0081 Tucson Electric Power Company has reviewed and approved the development plan. There are existing facilities within the development with no apparent conflicts. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Billiable relocation will require easements. Service at existing phase and voltage can only be relocated overhead. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, electrical load, paving off-site improvements and irrigation plans, if available include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Rich Harrington New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8726 Should you have any technical questions, please call the area Designer, Steve Garcia @ 917-8739. Sincerely, Beth Shelton Elizabeth "Beth" Shelton Admin Assistant, Design |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/11/2017 | ARUIZ1 | OUT TO CUSTOMER | Completed |