Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP17-0054
Parcel: 106101060

Address:
4010 N RUNWAY DR

Review Status: Completed

Review Details: RESUB - SITE and/or GRADING

Permit Number - DP17-0054
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/01/2017 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change UNIFIED DEVELOPMENT CODE
The following comments were not addressed from previous review.
7.6.4. LANDSCAPE STANDARDS:
Use of Drought-Tolerant Vegetation
1. Except as otherwise provided by this section, all plant material used for landscaping must be selected from the Arizona Department of Water Resource's Low Water Use/Drought Tolerant Plant List.
Gleditsia tricanthos is not on the list, revise plan and choose appropriate tree species.
Use of the Public Right-of-Way
Non-required landscaping may be placed in the public right-of-way, if the following standards are met:
1. The landscaping is approved by the City Engineer or designee and complies with the City Engineer's standards on construction, irrigation, location, and plant type;
2. All vegetation complies with the standards of Section 7.6.4, Landscaping Standards; and,
3. The landscaping does not interfere with the use of the sidewalk.
Obtain permission from: Gary Wittwer Transportation DepartmentLandscape Architect
Email: Gary.Wittwer@tucsonaz.gov
Phone: Office: 520-837-6618 for the use of ROW and add the appropriate notes on landscape plans.
SECTION 4-01.0.0: COMMERCIAL RAINWATER HARVESTING
3.2 Water Harvesting Implementation Plan
1. The plan shall detail the landscape water demand and the harvested water supply needed to meet 50 percent of landscape demand for the entire site not individual WHIA areas.
2. Provide water budget data, along with the background data and assumptions used to develop it. Contact Andrew.Connor@tucsonaz.gov for information on how to prepare and spread sheet for Water Harvesting Implementation Plan.
12/04/2017 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Clearly show how stormwater runoff directed to the water harvesting areas will provide the required volume in the 5-year storm.