Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE and/or GRADING
Permit Number - DP17-0054
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/13/2017 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 07/18/2017 | SSHIELD1 | HC SITE | REVIEW | Approved | |
| 07/18/2017 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Principal Planner PROJECT: Outlaw Excavation Development Package (2nd Review) DP17-0054 TRANSMITTAL DATE: July 18, 2017 DUE DATE: August 08, 2017 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 25, 2018. 2-06.3.0 FORMAT REQUIREMENTS 1. 2-06.3.12 - The drawing index does not include all sheets provided in the drawing set. Add sheets C3.0 & L1.1. CONTENT REQUIREMENTS 2. 2-06.4.2.D - As sheets have been added to the set, C3.0 & L1.1, the total number of sheets needs to be changed to 6 on all sheets. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. Previous comment 9 - This comment was not addressed. Zoning acknowledges your response but was not able to locating any information that demonstrates the gravel treatment you propose. 2-06.4.9.H.5.a - It appears the vehicle access is allowed to the large area to the east of the building. Any vehicle use areas will need to meet the requirements of 7.4.6.F, .H & .I. Any area used for storage us for construction equipment or materials will need some type of dust control. Once the above comments are addressed Zoning will provide an over-the-counter review. Call or email to schedule and appointment for this review. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 08/03/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 08/08/2017 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | UNIFIED DEVELOPMENT CODE 4.1 Identification and Descriptive Data A. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. 7.6.4. LANDSCAPE STANDARDS: Use of Drought-Tolerant Vegetation 1. Except as otherwise provided by this section, all plant material used for landscaping must be selected from the Arizona Department of Water Resource's Low Water Use/Drought Tolerant Plant List. Gleditsia tricanthos is not on the list, revise plan and choose appropriate tree species. Use of the Public Right-of-Way Non-required landscaping may be placed in the public right-of-way, if the following standards are met: 1. The landscaping is approved by the City Engineer or designee and complies with the City Engineer's standards on construction, irrigation, location, and plant type; 2. All vegetation complies with the standards of Section 7.6.4, Landscaping Standards; and, 3. The landscaping does not interfere with the use of the sidewalk. Obtain permission for the use of ROW and add the appropriate notes on landscape plans. SECTION 4-01.0.0: COMMERCIAL RAINWATER HARVESTING 3.2 Water Harvesting Implementation Plan The Water Harvesting Implementation Plan (Implementation Plan) shall consist of a separate sheet with a plan view layout of the site. 1. The plan shall detail the landscape water demand and the harvested water supply needed to meet 50 percent of landscape demand. 2. Provide water budget data, along with the background data and assumptions used to develop it. This water budget format is available to applicants as an Excel spreadsheet @ cms3.tucsonaz.gov/files/dsd/water_budget_spreadsheet.xls Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval. Additional comments may apply. |
| 08/08/2017 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | DP17-0054 1. Provide notarized permission from owners of adjacent properties for construction of the drainage facility to Gardner Lane. 2. Address the recommendation for a trapezoidal channel along Runway Drive. 3. Explicitly address the drainage improvements proposed in the tentative plat and explain whether they are needed. Provide clear reasoning. |