Permit Number: DP17-0018
Parcel: 127122650

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP17-0018
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/20/2017 LBOJORQ1 START PLANS SUBMITTED Completed
01/20/2017 KLEE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed Informational only
01/20/2017 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Passed Informational only
01/20/2017 KLEE1 OTHER AGENCIES U. S. POST OFFICE Passed Informational only
01/20/2017 KLEE1 UTILITIES SOUTHWEST GAS Passed Informational Only
01/23/2017 MARTIN BROWN COT NON-DSD FIRE Approved
01/23/2017 KLEE1 PIMA COUNTY WASTEWATER Reqs Change January 20, 2017


To: Theresa Hadley,
Cypress Civil Development.


____________________________________
From: Hussein Al Zubaidi, EPT, PCRWRD (520) 724-6404



Subject: 5721 EAST BROADWAY
P17WS00007 (DP17-0018)
PSL - 1ST Submittal

The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer design for the above-referenced project. The Pima County Regional Wastewater Reclamation Department has found the following deficiencies in the above referenced submittal of the Preliminary Sewer Layout (PSL), based upon PCRWRD Engineering Design Standards (EDS) 2016.

1- Sheet 5: As per the PCRWRD Engineering Design Standards 2016 Section 5.3 the horizontal alignment of Service Laterals shall not violate the frontage of adjacent properties while traversing to the point-of-connection to the Public Sewer. The overall length of Service Laterals within Right-of-Way shall be minimized as required by the local agency having jurisdiction. The horizontal alignment of Service Laterals should be horizontally perpendicular to the sewer line where possible. Service Laterals located within Right-of-Way shall be horizontally straight without curves or bends.


If you have any questions regarding this matter please contact me at your convenience.




Cc. Lorenzo Hernandez, P.E., RWRD
Francisco Galindo, P.E., RWRD
Tom Porter, P.E., RWRD
01/26/2017 DTAKAKI1 COT NON-DSD ENVIRONMENTAL SERVICES Approved The City of Tucson - Environmental Services Department has completed our review of the first submittal of the Development Plan for the 5721 E. Broadway facility. The waste stream calculations were reviewed and found to be correct. The 40 foot long access and operational area was provided in front of the enclosure.

Based on this review, the City of Tucson - Environmental Services Department approves the proposed solid waste management plans for the 5721 E. Broadway facility.

Please call me at 837-3713 if there are any questions concerning this review.

Tom Ryan
City of Tucson - Environmental Services Department
02/01/2017 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Kelly Lee, Lead Planner for Steve Shields - Principal Planner
PDSD Zoning Review Section

PROJECT: 5721 East Broadway- Food Service Use- Restaurant
Development Package (1st Review)
DP17-0018

TRANSMITTAL DATE: February 7, 2017

DUE DATE: February 15, 2017

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 19, 2018.

2-06.4.3 - Provide the development package case number, DP17-0018, adjacent to the title block on all sheets.

2-06.4.4 - Label 5th Street and 10th Street on the location map.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A.3 - Per review of C9-15-04 Rezoning Conditions on Sheet 2, conditions #31-33 are missing. Please add these condition(s).

2-06.4.7.A.6 - Add a note that the site has been designed to comply with UDC Section 5.4: Major Streets and Routes and UDC Section 5.5: Gateway Corridor Zone regulations.

2-06.4.7.A.8 - For development package documents provide:
2-06.4.8.C - On Sheet 3, dimension the distance between the curb and property line.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.F - Add existing C-1 zoning label across Broadway Blvd.

2-06.4.9.H.5 -Demonstrate there is 24-foot-wide PAAL behind the southernmost parking spaces of the existing apartment complex (Lenora Annex) to the east (See redline- sheet 3)

2-06.4.9.H.5.a -Clarify if wheel stops will be provided on all parking spaces. You may add a note to Keynote #33 on Sheet 3 or add note to Detail L on Sheet 6.

2-06.4.9.H.5.d - Show both short-term and long-term bicycle parking facilities fully dimensioned detail drawings as it relates its location adjacent to the building and to comply with UDC design criteria 7.4.9. Refer to Figure 7.4.9.C: Bicycle Parking Layouts. Please also indicate what type of surface the long term bicycle facility will be located on.

2-06.4.9.J -As shown on Sheet 3, the new vertical curb along Broadway Blvd. does not match the cross section in Technical Standards 10-01.6.0: Figure 9 150' Right-of-Way. The 150-foot cross section indicates there is a 12-foot dimension from the curb to the property line.

2-06.4.9.R -
(1) Provide a sidewalk dimension near the southeast corner of the building near the areas showing pop-outs. The minimum requirement is 4-feet. (See redlines on Sheet 3.)

(2) Label cross-slope and horizontal slope along sidewalk on east side of building. Also, label horizontal slope along patio area on south side of building.

2-06.4.9.U -
" Rezoning Condition #9- Trash enclosure requires a 6-foot wall. Add a note that states the height of the wall is 6-feet.
" Rezoning Condition #10- A 6-foot wall is required along north property line. Add a note to Sheet 3.
" Rezoning Condition #11- A minimum 10-foot landscape border is required along the north. Add a dimension on sheet 3.
" Rezoning Condition #16- The access aisle to the building entrance should be identified clearly and distinguished from vehicular areas. Symbolize what type of materials will be used for this crosswalk.
" Rezoning Condition #24- Contact John Beall for more detail on this requirement.
" Please also submit a separate memo stating how the rezoning conditions have been addressed.

Additional comments may be forthcoming based on the responses to the zoning review comments and changes to the DP. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov or Kelly Lee (837-6999) or Kelly.Lee@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
02/06/2017 PATRICIA GEHLEN ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please add outdoor lighting plan per rezoning condition 15 to the plan on the next submittal
02/07/2017 KLEE1 ZONING HC REVIEW Reqs Change See Zoning Comments.
02/09/2017 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond Revise the plans to clarify compliance with UDC 7.6.4.C.2.d and UDC 7.6.4.E.
02/09/2017 JOE LINVILLE NPPO REVIEW Approved
02/10/2017 ZELIN CANCHOLA COT NON-DSD TRAFFIC Reqs Change February 10, 2017
ACTIVITY NUMBER: DP17-0018
PROJECT NAME: New Restaurant
PROJECT ADDRESS: 5721 E Broadway Blvd
PROJECT REVIEWER: Zelin Canchola TDOT

1. A 25 foot curb return radius is required for driveways onto Arterial Streets. 18 feet is shown on the plan. Change driveway from proposed development to 25 feet.


If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov
02/14/2017 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Along the east property line provide wheel stop curbing or move the curb 2.5 feet from the property line to prevent cars from extending over the property line. UDC 7.4.6.H.1
2. General Paving and Grading Note 17 is not required for this project and may be omitted.
3. Callout for keynote 28 along the northern boundary seems to be misdirected or incorrectly identified. Please confirm all callouts and keynoted are correct.
4. Clearly dimension the space between the curb and property line along Broadway Boulevard. If the existing curb is not at the future based on the standard profiles, show the future curb line and future sight visibility triangles. The face of future curb is 9 feet from future right of way. (TSM 10-01.5.2.B.4 and TSM 10-01.9.0 Figure 9)
5. Show the roof drainage directions and downspout locations. Where downspouts might cross a sidewalk, provide scuppers for the discharge up to a 10-year event.
6. The landscape plan shows a landscape feature in the sidewalk/court area south of the building. Make sure all plans are consistent.
02/15/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
02/15/2017 JOHN BEALL COT NON-DSD URBAN PLANNING & DESIGN Reqs Change PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

DP17-0018 5721 E Broadway/1st Submittal Popeye's 2/15/2017

() Final Plat
(X) Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other - Elevations



SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() Approval
(X) Rezoning history on site
() Annexation history on site
() No Rezoning history on site - No Resubmittal Required:
() Tentative Plat
(X) Development Plan
() Landscape Plan
() Other










REVIEWER: MM DATE: 2/15/2017

COMMENTS

Popeye's Fast Food Restaurant 5721 E Broadway 1st submittal is currently being reviewed for DP17-0018. Subject to rezoning C9-15-04, please provide rezoning conditions 31-33 as approved by Mayor and Council November 4, 2015. Please refer to additional comments by zoning for wall height requirements for letter E and K on page 6 of development Package. Rezoning Conditions for C9-15-04, condition 7 date is not label correctly and condition 11 of the 10 foot wide landscape border must be verbatim on page 2 of Development Package.

31. All offsite improvements required with this development such as the driveway, alley improvements, curb, sidewalk, and ADA ramps shall be coordinated with the City of Tucson Department of Transportation to establish proper location(s) of the offsite improvements.
32. A new (6) foot wide ADA accessible sidewalk shall be constructed where necessary along the adjacent Broadway Boulevard street frontages and extending across alleyway at no cost to the City of Tucson to provide continuous pedestrian circulation. Standard width transition, wheelchair access ramps and site access points shall be provided when connecting to existing sidewalks.
33. Trash enclosures shall be setback no less than fifty feet (50) from the residential properties along the north property line as indicated on the PDP dated 9/17/15
02/16/2017 KLEE1 ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans
02/16/2017 JIM ROSSI COT NON-DSD REAL ESTATE Approved Real Estate has no concerns with DP17-0018 as presented.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/22/2017 MMENDIB1 OUT TO CUSTOMER Completed