Permit Number: DP16-0184
Parcel: 14026040A

Address:
2850 E DREXEL RD

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP16-0184
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2017 ARUIZ1 START PLANS SUBMITTED Completed
01/09/2017 AHINES2 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approv-Cond Addresss the review comments from the first submittal by adding general notes.
01/13/2017 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: January 23, 2017
DUE DATE: February 6, 2017
SUBJECT: Dock-Hi Industrial
TO: Rick Engineeering
LOCATION: 2850 East Drexel Road
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: DP16-0184
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) Per previous comment 34 and UDC 7.14.3, Section 5.2, item 6, the input values should be provided for the proposed hydraulic structures within the basins as part of the HEC-HMS model. These HEC-HMS models contained in Appendix E show a total 1.02 acre feet is retained when comparing the total inflow volume to the total outflow volume of basins 1 to 7. The Retention Basin Summary Table on page 8 (section 3.1) of the drainage report shows a total of 1.48 acre feet is retained. The Required Retention Volume Table on page 7 (Section 3.1) of the drainage report shows that only 0.95 acre feet is required to be retained. If the required HEC-HMS inputs include the 6" orifice plates, and 1.02 acre feet is being retained (ie. Infiltrated) on site per UDC 7.14.3, Section 1.3 then the report should be clarified accordingly and the other 0.46 acre feet that passes through the orifice plates should be classified as detention. Alternatively, the project should be revised to provide the required retention per UDC 7.14.3, Section 1.3 (ie. Infiltration, evaporation or reuse). A partial detention in-lieu of retention waiver may be requested for this project with appropriate calculations/documentation. See also previous comments 2, 3, 20, 30.
2) Keynote 21 should refer to detail S/18. Please see previous comment 17.
3) Per previous comment 41 and UDC 7.14.4, Section 10.3, Item 9 the stormdrain proposed in the right-of-way is required to be RCP. Sheet 19 still shows the proposed 4- 48" SRPs which should be RCP.
4) Per UDC 7.14.4, Section 14.5, Item 10, please show how the dry-well inlet will be elevated no less than six inches above the adjacent grade in order to reduce the influx of sediment into the dry-well system. This is a new comment for this submittal based on the addition of a drywell (as part of the second submittal) in one of the retention basins to address infiltration issues.

If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov.
01/17/2017 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Steve Shields - Principal Planner
PDSD Zoning Review Section

PROJECT: Dock Hi Industrial - 2850 E Drexel Road - P-I / I-1 Zoning
Development Package (2nd Review)
DP16-0184 Commercial Storage Use

TRANSMITTAL DATE: January 17, 2017

DUE DATE: February 6, 2016

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 21, 2017.


1. Follow Up to Previous Comment 1: The Pima County Tax Parcel combo documents must be submitted with the next submittal of the DP.

PREVIOUS COMMENT 1: Zoning is requesting that Parcel Tax Code numbers be combined through the Pima County Assessor's office prior to final approval of the DP.


2. Follow Up to Previous Comment 3: The subdivision case number has not been added to sheets 33 - 46. List the case number as requested. Also, assure that the DP, Rezoning and subdivision case numbers on sheets 29 - 53 are made legible, the text was printed very light on these sheets.

PREVIOUS COMMENT 3: List as reference the subdivision case number S98-021 in the lower right corner of all DP plan sheets.



If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
01/31/2017 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond 1) Revise the plans as necessary to incorporate compliance with conditions of TSMR #DS17-02.
02/02/2017 ZELIN CANCHOLA COT NON-DSD TRAFFIC Reqs Change February 2, 2017
ACTIVITY NUMBER: DP16-0184
PROJECT NAME: Doc-Hi Industrial
PROJECT ADDRESS: 2850 E Drexel Rd
PROJECT REVIEWER: Zelin Canchola TDOT

1. The proposed improvements in right of way, as shown in the development plan, are acceptable. However a modification to the striping will be required. Modify striping to reflect a continuous turn lane to accommodate the driveway on the north side of Drexel (east bound to northbound)

2. At time of construction a private improvement agreement (PIA) will be required.


If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov
02/06/2017 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Comment not addressed. [Initial comment: The current plumbing code is the International Plumbing Code (see Private Water and Backflow Assembly Notes, sheet 3 of 53).]
02/06/2017 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) A disk containing all items submitted
3) All items requested by review staff
4) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
02/17/2017 LBOJORQ1 OUT TO CUSTOMER Completed