Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP16-0168
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/23/2016 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
| 09/23/2016 | AHINES2 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | For notification purposes only. |
| 09/23/2016 | TIM ROWE | PIMA COUNTY | WASTEWATER | Passed | Plans do not require review per Sewer Submittal Review Worksheet. |
| 09/23/2016 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Passed | For notification purposes only. |
| 09/23/2016 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Passed | Plans do not require review per Addressing Submittal Review Worksheet. |
| 09/23/2016 | AHINES2 | OTHER AGENCIES | U. S. POST OFFICE | Passed | For notification purposes only. |
| 09/23/2016 | MARTIN BROWN | COT NON-DSD | FIRE | Reqs Change | The turn-around/hammerhead tee at south-east corner of project does not appear to meet standards. Each "leg" of the tee should be 57'. Please review and revise. Additional "No Parking - Fire Lane" signs will be required along and at end of aforementioned parking lot. |
| 09/23/2016 | AHINES2 | UTILITIES | SOUTHWEST GAS | Passed | For notification purposes only. |
| 10/06/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Principal Planner PROJECT: Via Elegante at Tucson Mountain Development Package (1st Review) DP16-0168 TRANSMITTAL DATE: April 10, 2016 DUE DATE: April 20, 2016 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is September 21, 2017. 2-06.4.9 - Information on Proposed Development 1. The following information on the proposed project shall be shown on the drawing or added as notes. 2. 2-06.4.9.H.5 - Provide PAAL width dimensions for all PAALs providing access to proposed vehicle parking spaces. 3. 2-06.4.9.R - There is a proposed accessible vehicle parking space shown along the south property line. This accessible space needs to be relocated so that it is closer to the building and that there is an accessible route provided to an accessible entrance to the building. 4. 2-06.4.9.R - There is a proposed accessible vehicle parking space shown along the north side of the northern most parking area. This accessible space needs to be relocated so that it is closer to the building and that there is an accessible route provided to an accessible entrance to the building. 5. 2-06.4.9.R - There are two (2) accessible vehicle parking spaces shown northeast of the entrance canopy. Clearly show the accessible route from the accessible parking spaces to an accessible entrance of the building. 6. 2-06.4.9.R - Clearly show the accessible routes from all accessible vehicle parking spaces to an accessible entrance of the building. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 10/10/2016 | SSHIELD1 | ZONING HC | REVIEW | Reqs Change | See Zoning comments |
| 10/13/2016 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | Revise as may be requested by other agencies. |
| 10/14/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Revise the site drawing to include the following existing utility information: a. The location and size of water wells, water pumping plants, water reservoirs, water lines, and fire hydrants. b. If an on-site sewage disposal system is or is to be located on site, show the location of all individual components for the disposal system, including any reserve areas and indicate the required separation distances. Reference: City of Tucson Administrative Manual, Section 2-06.4.8D and Section 107.2.1, IBC 2012. |
| 10/14/2016 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Passed | |
| 10/19/2016 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
| 10/20/2016 | GLENN HICKS | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are affected by this development. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation (520) 837-8040 Howard.Dutt@tucsonaz.gov |
| 10/24/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 10/26/2016 | AHINES2 | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/27/2016 | ARUIZ1 | OUT TO CUSTOMER | Completed |