Permit Number: DP16-0152
Parcel: 12004003B

Review Status: Completed

Review Details: DEV PKG

Permit Number - DP16-0152
Review Name: DEV PKG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/24/2016 AHINES2 START PLANS SUBMITTED Completed
08/25/2016 MARTIN BROWN COT NON-DSD FIRE Approved
09/07/2016 PAUL BAUGHMAN ENGINEERING REVIEW Approved
09/13/2016 DAVID RIVERA ZONING HC REVIEW Approved
09/13/2016 DAVID RIVERA ZONING REVIEW Approv-Cond A variance and / or a TRE will be required for approval of the proposed Commercial Monument signage along the Irvington Road right of way. Permits must be applied for under separate permit.
09/20/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, drinking fountains, etc.).
2. The rim elevation of the next upstream sanitary manhole (MH 5810-09, 2428.13') is higher than the first floor elevation (2323.75') of the relocated restroom. Provide a note on the plans requiring the installation of a backwater valve. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson.
09/21/2016 TIM ROWE PIMA COUNTY WASTEWATER Approv-Cond This project originally reviewed as DP16-0044 and approved on 08/05/2016 as attached, whoever, Jeff Hunt from Cypress Civil Development contacted me on 09/15/2016 stating that a plan modification to be submitted in few weeks.

This project currently under conditional approval until we get the new submittal for review.

Regards

AL.

___
August 5, 2016

To: Jeff Hunt, PE
Cypress Civil Development, Inc
____________________________________
From: Hussein Al Zubaidi, RWRD (520) 724-6404

Subject: IRVINGTON & I10 COMMERCIAL CENTER
P16WS00028
TP- 3rd Submittal

The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer design for the above-referenced project. The Pima County Regional Wastewater Reclamation Department hereby approves the above referenced submittal of the Preliminary Sewer Layout (PSL), based upon PCRWRD Engineering Design Standards (EDS).

If you have any questions regarding this matter please contact me at your convenience.

Cc. Lorenzo Hernandez, P.E., RWRD
Thomas Porter, P.E., RWRD
Francisco Galindo, P.E., RWRD
09/21/2016 JOE LINVILLE LANDSCAPE REVIEW Approv-Cond AM 2-06.4.7.F.2 Obtain approval in writing from Tucson Parks and Recreation. This is typically provided as a signature block on the cover sheet:

Previous Tucson Parks and Recreation Comments for the adjacent Irvington 1-19 Mixed Use Commercial Shopping Center : Utility connections to the relocated park restroom are not shown on Utilities Plan
Utility connections to new park drinking fountain are not shown on Utility Plans
Detailed plans indicating irrigation modifications in the Santa Cruz River Park will need to be approved and approved by Tucson Parks and Recreation and Pima County Natural Resources Parks and Recreation departments staff.
•All new or relocated improvements including the paths, drinking fountain, planting, and irrigation installations located in the River Park are to conform to current Pima County Standard Specifications and Details for Park Development and the Pima Regional Trails System Master Plan.
All facilities in the Santa Cruz River Park are to be fully ADA accessible, including the relocated restroom, drinking fountain, and exercise stations.
Review the locations of the proposed exercise stations. One appears to be in a detention basin.
09/21/2016 JOE LINVILLE NPPO REVIEW Approved
09/23/2016 AHINES2 ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) A disk containing all items submitted
3) All items requested by review staff
4) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
09/27/2016 AHINES2 OUT TO CUSTOMER Completed