Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP16-0139
Parcel: Unknown

Review Status: Completed

Review Details: SITE and/or GRADING

Permit Number - DP16-0139
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/25/2016 MARTIN BROWN FIRE REVIEW Reqs Change Existing hydrant appears to exceed allowable distance to building. Please review section 507.5 of the 2012 International Fire Code.
08/25/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. An approved development plan is not to be used for the construction of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). The construction of the on-site utilities may be included with the permit for constructing the building or as a separate permit.
2. Clarify the intent for the building sewer. Keynote #17 on sheet 2 of 8 calls out a 4" BCS but the development plan shows three new private sanitary manholes with a 6" building sewer. In addition, what appears to be a branch of the building sewer is shown extending to the southwest from the building sewer roughly mid-way between the first two manholes. The presence of manholes and combining the building sewers from two or more separate buildings will require a review of the private sewer collection system design by the Pima County Department of Environmental Quality. Submit the design to PDEQ at 150 W Congress St, 1st Floor (520-724-7382). A separate plumbing permit from Development Services will be required for construction of the private sewer collection system and manholes. Reference: Title 18, R18-9-E302, 4.02 General Permit, Arizona Administrative Code.
3. Provide the rim elevations and inverts of the proposed private manholes. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson.
08/25/2016 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Principle Planner

PROJECT: NMC MOB Lot A
Development Package (1st Review)
DP16-0139

TRANSMITTAL DATE: August 22, 2016

DUE DATE: August 29, 2016

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 14, 2016.

CONTENT REQUIREMENTS

1. 2-06.4.2.B - The legal description shown in the title block is not correct.

2. 2-06.4.3 - The address shown in the title block does not appear to be correct. 9044 S. Houghton is not an address associated with parcel 141-18-008F.

3. 2-06.4.3 - Provide the development package case number, DP16-0139, adjacent to the title block on each sheet.

4. 2-06.4.3 - Provide the development package case number, DP15-0119, adjacent to the title block on each sheet.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

5. 2-06.4.9.E - The proposed lot split will need to be completed prior to approval of the development package. The proposed parcel will need to be combined with parcel 141-18-634A see UDC Article 6.6.1.A.

6. 2-06.4.9.H.5.a - It does not appear that the vehicle parking space calculation is correct. If Lot A is to be part of the Houghton Town Center than the vehicle parking space calculation would be based on a shopping center calculation of 1 space per 300 gfa which would require 33 spaces

7. 2-06.4.9.H.5.a - As parcel 141-18-008F is not part of the Houghton Town Center tentative/final plat and cross parking and access are proposed provide a copy of the cross access agreement that includes this parcel.

8. 2-06.4.9.R - Per TSM Section 7-01.3.3.B and IBC Sections 1104.2 provide a sidewalk/accessible route connecting the proposed building to the building located to the east.

9. 2-06.4.9.R - For your information truncated domes are not required on accessible ramps located on private property.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
08/25/2016 SSHIELD1 H/C SITE REVIEW Reqs Change See Zoning comments
08/25/2016 PGEHLEN1 PIMA COUNTY ADDRESSING Reqs Change See Addrressing comments in PRO/SIRE at the following link:

https://www.tucsonaz.gov/PRO/Command?mode=permit&firstTime=true&number_key=dp16-0139&command=InitialProcess&SearchButton=Search

Click on the button associated documents and plans and open the documents folder.

DP16-0139 NMC MOB Lot A at Houghton Town Center 1st Submittal is being Returned for Corrections. Please see the sticky note comments in the attached pdf. There is also a Comment Summary for your use.

Please let me know if you have any questions.

Thank you,



Robin Freiman

Addressing Specialist

Pima County Development Services Department

201 N Stone AV – 1st Floor
Tucson, AZ 85701

(520) 724-7570

Description: Description: cid:image001.png@01CE70DF.60625CC0

Click here to search for Projects and Permits or to make a Payment

Click here to search for Septic Records
08/26/2016 JOE LINVILLE LANDSCAPE REVIEW Reqs Change Lot A contains areas adjacent to the EPNG easement that were shown as landscaped on the approved landscape plans (D06-0013). Revise the plans to indicate the landscape areas. Note any future phase landscape improvements.
08/26/2016 JOE LINVILLE NPPO REVIEW Approved
08/30/2016 LOREN MAKUS ENGINEERING REVIEW Reqs Change Revise general note 25 on the first sheet to remove the 6-inch maximum depression for water harvesting. A suggested note is "Depress all landscape areas 6 to nine inches for water harvesting."
Clearly show and label the existing elements in the corner of the adjacent establishment and how the proposed changes will affect them.
Show the estimated discharge through the extended storm drain. Show the existing storm drain system and the tie-in to the new.
09/01/2016 AHINES2 ZONING-DECISION LETTER WRITE DECISION LETTER Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) A disk containing all items submitted
3) All items requested by review staff
4) All items needed to approve these plans