Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SITE and/or GRADING
Permit Number - DP16-0138
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/09/2016 | JOE LINVILLE | LANDSCAPE | REVIEW | Reqs Change | Accessory structure waiver required. See zoning comments. Provide planting and irrigation plans for new plantings. AM 4.2.C |
09/09/2016 | JOE LINVILLE | NPPO | REVIEW | Reqs Change | 1) Preparation of all elements of the Native Plant Preservation Plan and on-site monitoring as required under Section 7.7.5.C.5, On-Site Monitoring, must be performed by a plant professional, such as: 1. An arborist certified by the International Society of Arboriculture; 2. A landscape architect; or, 3. A horticulturist, biologist, or botanist with a minimum B.A. or B.S. in an appropriate arid environment natural resource field. |
09/13/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The piers for the canopies appear to be very close to the un-verified locations of the private sewer collection system ((P1 - two places), a natural gas pipeline (P5), a fiber optic cable (P8), and a cable TV line (P8 and P7). Show how close the piers can be to these utilities without causing damage to the utilities and what steps will be taken to avoid the utilities. Reference: section 107.2.1, IBC 2012. |
09/20/2016 | KROBLES1 | H/C SITE | REVIEW | Needs Review | |
09/20/2016 | KROBLES1 | ADA | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/20/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |