Permit Number: DP16-0121
Parcel: 113084990

Address:
816 E HEDRICK DR

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Permit Number - DP16-0121
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/16/2016 KROBLES1 START PLANS SUBMITTED Completed
11/21/2016 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved DP16-0121 Park Modern West / 2nd Submittal is Approved by Pima County Addressing.

Thank you,

Robin Freiman
Addressing Specialist
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
11/29/2016 PAUL BAUGHMAN ENGINEERING REVIEW Approved ...
11/30/2016 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR

TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Ada Griffin
GIS Cartographer
Pima County Assessor's Office

DATE: November 28, 2016

RE: Assessor's Review and Comments Regarding:

DP16-0121 TENTATIVE PLAT FOR PARK MODERN WEST/2ND SUBMITTAL

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor's Office requirements.
___ ___ Plat does not meet Assessor's Office requirements.

COMMENTS:

" THANK YOU FOR YOUR SUBMITTAL.

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
12/05/2016 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Principle Planner

PROJECT: Park Modern West
Development Package (1st Review)
DP16-0121

TRANSMITTAL DATE: December 6, 2016

DUE DATE: December 14, 2016

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is July 18, 2017.

2-06.4.7.A - Zoning and Land Use Notes

1. This comment was not addressed. 2-06.4.7.A.6.a - Provide the Architectural Variation Plan case number adjacent to the title block on all sheets. Also provide a general note station the Architectural Variation Plan case number, date of approval, and any conditions of approval on the plan.

2. This comment was not addressed. 2-06.4.7.A.6.a - Provide the Privacy Mitigation Plan case number adjacent to the title block on all sheets. Also provide a general note station the Privacy Mitigation Plan case number, date of approval, and any conditions of approval including a description of the required mitigation and for which units the mitigation applies on the plan.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

3. This comment was not addressed. The "PRIVATE STREET SECTIONS" call out "25' PAAL" & "24' PAAL". Again are you proposing private streets or PAALS? 2-06.4.9.H.5 - It's not clear if you are proposing a parking area access lane to access the garage or a private street. Sheet 3 calls out "DRIVE" and on sheet 4 the sections and the title block call out "STREET". Clarify if you are proposing a drive or street.

4. The TSMR will need to be approved prior to approval of the development package. 2-06.4.9.R - Depending on how comment 5 is addressed the following may apply; per TSM Section 7-01.4.1.B A sidewalk is required adjacent and parallel to any access lane or PAAL on the side where buildings are located or TSM Section 10-01.2.7.A All streets require a sidewalk area on each side of the street. Provide the required sidewalks along the PAALS or street.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
12/07/2016 KBROUIL1 COT NON-DSD FIRE Reqs Change Sheet 6 indicates that the fire service mains are private. This is not allowed. Please note all fire service mains are required to be Public.-Ken Brouillette
12/07/2016 JOE LINVILLE LANDSCAPE REVIEW Reqs Change 1) One canopy tree is required for every 40 feet of pedestrian circulation path. provide calculations and revise the landscape plan as necessary to comply. UDC 8.7.3.H.2

Address pedestrian circulation along Drive B, Drive C, between the building located between Drives B & C, and along portions of the north boundary.
12/13/2016 CLAURIE1 DESIGN PROFESSIONAL REVIEW Approved
12/14/2016 PGEHLEN1 UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the 2nd submittal of the Tentative Plat for Park Modern West.
If you have any questions, please feel free to contact me at 520-917-8744.

Thank you,

Mary Burke
Right of Way Agent II
Tucson Electric Power Co.
Mail Stop HQE613
PO Box 711, Tucson, AZ 85702
Office - 520-917-8744
Cell - 520-401-9895
mburke@tep.com
12/14/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change The finished floor elevation of the (re-numbered) lot 80 is 12" above the rim elevation of the next upstream manhole. A backwater valve shall not be installed unless the finished floor elevation is less than 12" above the rim elevation of the next upstream manhole. [Initial comment: The finished floor elevations of lots 28 and 29 appear to be less than 12" above the rim of the next upstream manhole. Indicate the need for a backwater valve for these lots. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson.]
12/15/2016 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) All approved documents submitted previously
3) All items requested by review staff
4) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
12/30/2016 ARUIZ1 OUT TO CUSTOMER Completed