Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP16-0077
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/09/2016 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
08/11/2016 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Reqs Change | Applicant needs to respond to Addressing Review Comments. Addressing Letter proveded in Documents folder in PRO. |
08/15/2016 | AHINES2 | COT NON-DSD | ENVIRONMENTAL SERVICES | Approved | The City of Tucson - Environmental Services Department (ES) has completed our review of Project Number DP16-0077, Jewish Federation Office / 2nd Submittal. In the first review of this package, the following modifications were requested: Provide a recycling container in addition to the refuse container. Revise the waste stream note to reflect that the waste stream is to be divided evenly between the refuse and recycling containers. Show the 25 foot vertical clear area is maintained above the access and operational area of 14 feet by 40 feet in front of the enclosure. The review of the second submittal shows that the above requested modifications have been satisfactorily made. Therefore, ES approves the second submittal of the Development Package for the Jewish Federation Office site from a solid waste standpoint. Please contact me if there are any questions concerning this review. Tom Ryan City of Tucson - Environmental Services Department |
08/17/2016 | MARTIN BROWN | COT NON-DSD | FIRE | Reqs Change | Travel distance (sheet 6) is "as the hose lays". TFD will tie hose to hydrant, then drive to building, laying hose as they drive. They will not drive over parked cars. Please redraw travel distance on sheet 6, with dimensions between turns. |
08/24/2016 | DAVID RIVERA | ZONING HC | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera for Steve Shields Principal Planner PDSD Zoning Review PROJECT: Jewish Community Center Office Development Package (1st Review) DP16-0077 TRANSMITTAL DATE: August 24, 2016 DUE DATE: September 7, 2016 COMMENTS: CONDITIONAL APPROVAL: Please resubmit revised drawings which states how the remaining Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 5, 2017. CONTENT REQUIREMENTS 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. Follow up Comment to Previous Comment 16: Part two of previous comment 16 was not addressed. The Cross and Longitudinal (horizontal) slopes for all new sidewalks were not labeled on the site or grading plan. Label the slopes as requested. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. 16. COMMENT: Label the width of the new sidewalks where they are not dimensioned especially at locations where transitions from 5.5 feet wide sidewalks to narrower sections of sidewalks. Label the longitudinal and cross slopes on new sidewalks utilizing the spot elevations noted on the grading plan. Add detail drawing of the sidewalk access ramps. The detail shall be dimensioned and slopes referenced. 2. Follow up Comment to Previous SCZ Notes Comment: The note related to colors must be added tot eh SCZ notes text block on sheet 11. UDC 5.3.10 ADDITIONAL DESIGN CONSIDERATIONS: Building or structure surfaces, that are visible from the Scenic Route, shall have colors that are predominant within the surrounding landscape, such as desert and earth tones. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
08/24/2016 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera for Steve Shields Principal Planner PDSD Zoning Review PROJECT: Jewish Community Center Office Development Package (1st Review) DP16-0077 TRANSMITTAL DATE: August 24, 2016 DUE DATE: September 7, 2016 COMMENTS: CONDITIONAL APPROVAL: Please resubmit revised drawings which states how the remaining Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is May 5, 2017. CONTENT REQUIREMENTS 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. Follow up Comment to Previous Comment 16: Part two of previous comment 16 was not addressed. The Cross and Longitudinal (horizontal) slopes for all new sidewalks were not labeled on the site or grading plan. Label the slopes as requested. 2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. 16. COMMENT: Label the width of the new sidewalks where they are not dimensioned especially at locations where transitions from 5.5 feet wide sidewalks to narrower sections of sidewalks. Label the longitudinal and cross slopes on new sidewalks utilizing the spot elevations noted on the grading plan. Add detail drawing of the sidewalk access ramps. The detail shall be dimensioned and slopes referenced. 2. Follow up Comment to Previous SCZ Notes Comment: The note related to colors must be added tot eh SCZ notes text block on sheet 11. UDC 5.3.10 ADDITIONAL DESIGN CONSIDERATIONS: Building or structure surfaces, that are visible from the Scenic Route, shall have colors that are predominant within the surrounding landscape, such as desert and earth tones. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
09/01/2016 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
09/07/2016 | AHINES2 | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) A disk containing all items submitted 3) All items requested by review staff 4) All items needed to approve these plans |
09/07/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Approv-Cond | The plan is approved on the condition that a Floodplain Use Permit is applied for and approved for the project. I will be able to approve the FUP over the counter. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/20/2016 | RBENT2 | OUT TO CUSTOMER | Completed |