Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP16-0052
Parcel: 13009002B

Address:
3310 E 22ND ST

Review Status: Completed

Review Details: SITE and/or GRADING

Permit Number - DP16-0052
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/06/2016 MARTIN BROWN FIRE REVIEW Approved
04/14/2016 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: April 14, 2016
DUE DATE: April 22, 2016
SUBJECT: Drive-thru remodel
TO: Preston Johnson
LOCATION: 3310 E 22nd Street
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: DP16-0052
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) Per TSM 4-01.3 Commercial Rainwater Harvesting Standards apply to this development plan.
2) Per TSM 4-01.2.1A6 planting areas that harvest rainwater should be recessed below the grade of adjacent hardscapes. Hardscape surfaces should be sloped towards adjacent recessed planting areas. Please update Exhibit 4 and site plan to show hardscapes being routed to existing landscape area/water harvesting areas. Please show proposed depth of depressed landscaping areas such that stormwater is captured in accordance with the drainage report, AM 2-06.4.9N1 and AM 2-06.4.9N2. Please note that per Google Street View there does not appear to be any existing water harvesting from hardscapes on this site. Please update the drainage report planned conditions section to show an increase in water harvesting area per City of Tucson water harvesting standards.
3) Per AM 2-06.4.8F and AM 2-06.4.9N3 please show existing and proposed curb openings where stormwater drains off of hardscaping and into depressed water harvesting areas.
4) Per AM 2-06.4.3 please list the DP16-0051 in the title block area of each sheet.
If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov.
04/18/2016 SSHIELD1 H/C SITE REVIEW Reqs Change See Zoning comments
04/18/2016 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Principal Planner

PROJECT: McDonald's - 3310 E. 22nd Street
Exterior Drive-Thru Renovations
Development Package (1st Review)
DP16-0052

TRANSMITTAL DATE: April 18, 2016

DUE DATE: April 22, 2016

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is March 23, 2016.

1. 2-06.3.7 - A small, project-location map shall be provided in the upper right corner of the cover sheet.

2. 2-06.4.2.D - Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) on the alta sheets.

3. 2-06.4.3 - Provide the development package case number, DP16-0052, adjacent to the title block on all sheets.

4. 2-06.4.4 - The project-location map to be located on the first sheet of the development package in the upper right corner, shall cover approximately one square mile, be drawn at a minimum scale of three inch equals one mile, and provide the following information.
2-06.4.2.A - Show the subject property approximately centered within the one square mile area;
2-06.4.2.B - Identify major streets and regional watercourses within the square mile area and all streets that abut the subject property; and,
2-06.4.2.C - Section, township, and range; section corners; north arrow; and the scale will be labeled.

5. 2-06.4.7.A.4 - As a general note identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. This use should be listed as "FOOD SERVICE, EXCLUDING SOUP KITCHENS SUBJECT TO USE SPECIFIC STANDARDS 4.9.4.M.1 & 5 and 4.9.13.O".
6. 2-06.4.7.A.6.a - Sheet 4 general note 20 remove the reference to "GATE WAY CORRIDOE" from the plan.

7. 2-06.4.7.A.6.a - Provide the Board of Adjustment case number "C10-98-78" adjacent to the title block on all sheets.

8. 2-06.4.7.A.8.a - There appears to be a discrepancy in the total floor area of the building. Based on a letter
from Rory Juneman, Esq, dated February 17, 2016 and the last approved site plan from 1999, the total square footage on site was 8,762 sf. This plan shows 5,506 sf. There is also a small expansion shown on sheet 6 called out under keynote 42 that should be included in the total square footage shown on the plan.

9. 2-06.4.7.A.8.b - Remove the reference to "LOT COVERAGE" as it is not applicable.

10. 2-06.4.9.F - Provide the existing zoning classifications for the parcels north of 22nd and west of Randolf Pkwy.

11. 2-06.4.9.H.5 - Per UDC Table 7.4.6-2 the minimum width for a one-way access lane is 10'-0". Sheet 6 the 9'-5" access lane shown north of the drive-thru does not meet this requirement.

12. 2-06.4.9.H.5.a - The vehicle parking space calculation is not correct. The vehicle parking space calculation should match what is shown on the 1999 site plan.

13. 2-06.4.9.Q - Provide the correct square footage within the footprint of the building see comment 8.

14. 2-06.4.9.R - Provide a width dimension for the sidewalk/ramp shown north of drive-thru. This width dimension should clearly show that 4'-0' clear is maintained between the existing and proposed handrails.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
04/20/2016 ANDREW CONNOR NPPO REVIEW Approved
04/20/2016 ANDREW CONNOR LANDSCAPE REVIEW Approv-Cond Ensure that all Zoning and Engineering comments and concerns are addressed.
04/22/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
04/26/2016 KROBLES1 OUT TO CUSTOMER Completed