Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP16-0011
Parcel: 116300260

Review Status: Completed

Review Details: GRADING

Permit Number - DP16-0011
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/10/2016 ELIZABETH LEIBOLD ENGINEERING REVIEW Reqs Change DATE: February 10, 2016
TO: William Burger
SUBJECT: 2154 S Little Dipper Drive Grading Plan Review
LOCATION: Wildcat Pass S02-008 lot 26
REVIEWER: Elizabeth Leibold, P.E.
ACTIVITY NUMBERS: T15CM07842 (building plan set), DP16-0011 (Development Package - Grading)
COMMENTS:
1) Admin Man Sec.2-06.4.7: Address the remaining comments:
a) Plans shall not include white out areas - resubmit with no marked out or white out.
b) Provide sequential numbered sheets in next submittal. (Missing sheet 1.2?) Landscape plans may not be required for this Development Package submittal - confirm with Zoning or Landscaping staff regarding this requirement for this custom grading lot development.
c) Add "DP16-0011" to grading plan sheet and any other sheets within the Development Package.
d) Add the following as a note: (if applicable) no slopes shall exceed 2:1(H:V) unless geotechnical report recommendations with proposed slope design are provided to the City for review.
2) Tech Man Sec.2-01.4.C: It appears that 1.5:1(H:V) slopes may be proposed on sheet 1.1. A Soils Report with geotechnical recommendations will be needed for slopes greater than 2:1(H:V). If slopes are proposed to be 2:1(H:V) or less steep, revise and clarify slope grade and label slopes with gradient proposed (i.e. 2:1(H:V), or 3:1(H:V) etc) on grading planview.

Elizabeth Leibold, P.E., CPM, CFM
Civil Engineer
Engineering Division
Planning & Development Services Dept
02/11/2016 STEVE SHIELDS ZONING REVIEW Reqs Change Zoning cannot approve until the grading plan is approved by Engineering.
02/11/2016 ANDREW CONNOR NPPO REVIEW Reqs Change Ensure that all Zoning and Engineering comments and concerns are addressed.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/11/2016 AROMERO4 OUT TO CUSTOMER Completed