Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP15-0174
Parcel: 99999999A

Address:
9955 E 22ND ST

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Permit Number - DP15-0174
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/05/2016 MICHAEL ST. PAUL ZONING REVIEW Approv-Cond The Design Review Professional approval is required.
01/12/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Based on the supplied preliminary FFE, a backwater valve will be required for lot #3 (PG = 2812.5', Rim = 2811.6'). [Initial comment: Revise the site drawing to identify which lots will require the installation of a backwater valve. A backwater valve shall be installed where the finish floor elevation will be less than 12 inches above the elevation of the next upstream manhole in the public sewer system. Reference: Admin Manual Section 2-06.4.9.N.4.]
01/12/2016 FDILLON1 DESIGN PROFESSIONAL REVIEW Denied Same comments apply since last review.


(1) The same architectural elevation shall not be repeated more often than every fourth lot.
Comment 1: Please provide a Site Plan (or site plan notes) indicating the location of the models and showing the same model will not be repeated in lot sequence more than four times in a row.
(3) Garage Placement. For FLD projects with over 20 or more single family detached residential units, no more than 50 percent of detached residential units throughout the FLD shall be designed with garages that protrude from or are flush with the front wall of the living area or front porch of the house.
Comment 2: Please provide a Site Plan indicating no more than 50% of the detached units are flush or project from the front wall living area.
Architectural Variation Plan Required
(2) The AVP shall be included with the subdivision plat, site plan, or building permit submittal.
(5) Conditions of the approved AVP shall be included as notes on the approved plat or site plan, whichever applies, and the building plan.

Comment 3: Please demonstrate in the Site Plan how dwellings are configured to provide Solar Access and passive Solar considerations.

3. Solar Access and Passive Solar
a. Solar Access
Dwelling units should be configured to allow solar access to adjacent structures in accordance with Section 7.3, Solar Considerations.
b. Passive Solar
FLD projects should incorporate passive solar design when practicable.
01/13/2016 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) All items requested by review staff
3) All items needed to approve these plans
12/15/2015 AROMERO4 START PLANS SUBMITTED Completed
12/17/2015 BVIESTE1 ENV SVCS REVIEW Approved Patricia reviewed plans for note required below prior to approval

The Development Plan has been reviewed on behalf of the Environmental Services Dept and the following will need to be addressed on the resubmittal:

1. Add a general note stating the refuse and recycling service is to be individual curbside service. Plastic containers (APCs) shall be placed and removed from the curbside collection area on the day of service and shall be stored from public view.

If there are any questions, I can be reached at kperry@perryengineering.net

Final Status

Task End Date Reviewer's Name Type of Review Description
01/25/2016 EGALLET1 OUT TO CUSTOMER Completed