Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP15-0163
Parcel: 119310060

Review Status: Completed

Review Details: GRADING

Permit Number - DP15-0163
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/02/2015 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Please revise the ACS after the set-aside is removed. According to UDC 5.2.5.A, the ACS of the lot remaining outside the set-aside natural area is calculated to determine gradable percentage. The area of the whole lot is used to determine the gradable area.
2. Clearly state the area in square feet and the percentage of the lot which will be graded.
3. Provide a note indicating the retaining wall adjacent to the driveway will require separate structural review and permitting.
4. Revise paving and grading notes 31 and 32. "As-builts" will not be required. If the proposed project is completed in accordance with the approved plan, no additional plan is required. If not completed in accordance with the plan, a revised plan will be required.
5. Remove paving and grading note 30. The project is not adjacent to any public right-of-way. Consider whether note 2 is required.
6. Revise all of the general notes to be applicable to the specific needs of this project.
10/14/2015 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: 3093 West Mockingbird Lane
Grading Plan (1st Review)
DP15-0163

TRANSMITTAL DATE: October 14, 2015

DUE DATE: October 14, 2015

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning cannot approve the grading plan until approved by Engineering and Landscape review.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
10/14/2015 ANDREW CONNOR NPPO REVIEW Reqs Change Ensure that all Engineering comments and concerns are addressed.

Revise ACS calculation to exclude NUOS area per UDC 5.2.5.A

Final Status

Task End Date Reviewer's Name Type of Review Description
10/23/2015 KROBLES1 OUT TO CUSTOMER Completed