Permit Number: DP15-0126
Parcel: 99999999A

Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - DP15-0126
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/27/2017 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: DP16-0126
Grading Plan As built drawings (1st Review)
1801 W Valencia Road

TRANSMITTAL DATE: January 27, 2017

DUE DATE: February 23, 2017

COMMENTS:


1. COMMENT: It is my understanding from the CDRC Manager that a revised Development Package must be submitted and approved before the as built grading plan can be approved. Please contact Patricia Gehlen at 837-4919 or Patricia.Gehlen@tucsonaz.gov for the DP revision requirements.


2. COMMENT: Zoning will review the As built grading plans on the next submittal and compare them to the revised DP for consistency. If the revised DP and the As built grading plan are consistent zoning will approved the As built conditions.


If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

You can contact David Rivera on Tuesday and Wednesday from 8 to 5 at (520) 837-4957 or by email at David.Rivera@tucsonaz.gov
02/03/2017 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: February 3, 2017
DUE DATE: February 23, 2017
SUBJECT: Final As-built Certification
TO: Ali Fakih, PE, LEED AP
LOCATION: 1795 W Valencia Road
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: DP15-0126, Revision 1
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) A change in outlet elevation from the subsurface retention from 2470.08 to 2471.27 as shown on sheet 18 increases the need for effective infiltration. Per note under keynote 45 on sheet 18 there is a requirement for post construction infiltration testing prior to final grading inspections/approvals. Please provide a copy of the post construction infiltration testing that shows infiltration within the 12 hour requirement. Please see UDC 7.14.3, Section 3.5.1, items 3 and 5 for infiltration testing requirements. - Subsequent percolation test submitted to the City via email from Lisa Bowers to Loren Makus on February 23, 2017 showed an infiltration rate of 0.2 inches per hour. This will not provide the required infiltration to drain in 12 hours. An alternative solution must be provided that drains the retention area in 12 hours or less.
2) Address all zoning comments.
If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov.
02/16/2017 ANDREW CONNOR NPPO REVIEW Reqs Change Revised Development Package must be submitted and approved before the as built grading plan can be approved. Contact Patricia Gehlen at 837-4919 or Patricia.Gehlen@tucsonaz.gov for the DP revision requirements.