Permit Review Detail
Review Status: Completed
Review Details: TENTATIVE PLAT REVIEW
Permit Number - DP15-0117
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/21/2016 | ARUIZ1 | START | PLANS SUBMITTED | Completed | |
| 05/09/2016 | AHINES2 | PIMA COUNTY | ADDRESSING | Approved | DP15-0117/3rd Submittal/1st Avenue Self-Storage II is approved by Pima County Addressing. Thank you, Robin Freiman Addressing Specialist Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
| 05/10/2016 | SSHIELD1 | H/C SITE | REVIEW | Approved | |
| 05/10/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: 1st Avenue Self Storage II Development Package (3rd Review) DP15-0117 TRANSMITTAL DATE: May 10, 2016 DUE DATE: May 10, 2016 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is, 2016. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) Section 2-06.1.0 GENERAL 2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS 2-06.3.0 FORMAT REQUIREMENTS 2-06.4.0 CONTENT REQUIREMENTS 2-06.5.0 FLEXIBLE LOT DEVELOPMENT (FLD) - ADDITIONAL REQUIREMENTS 2-06.1.0 GENERAL 2-06.1.1 PURPOSE This standard has been prepared for the purpose of informing applicants of the submittal and review requirements for development package documents to assure proper and adequate information is presented in a consistent manner, thereby providing the basis for an efficient and timely review. The development package documents are prepared in support of applications for building permits and related reviews. The information that is requested establishes the basis upon which the project will be approved and could affect what is required of the property in the future, should there be a proposal for expansion or for a different use of the property. This standard does not waive any applicable city regulations or codes. 2-06.1.2 APPICABILITY This standard shall be used for all site plans and tentative plats submitted to PDSD for review. 2-06.2.1 APPLICATION SUBMITTAL REQUIREMENTS Development Package applications are available from PDSD. Completed applications and accompanying materials shall be submitted to PDSD. Incomplete or inaccurate applications will not be accepted, nor will any application in which the pre-application conference or neighborhood meeting requirements have not been met. The types of documents and the specific number of copies required of each of the documents are on the PDSD website or may be obtained from PDSD. Resubmittals of development packages require a comment response letter that details how all previous comments have been addressed. Provide the same number of copies of the comment response letter as plans provided. The following documents and information shall be submitted upon application: 2-06.2.1 Application Form A completed application signed by the property owner or authorized designee; 2-06.2.2 Development Package A development package must be prepared to the format and content requirements described herein; 2-06.2.3 Related Reviews In addition to the plan process, a project may require review for other types of plans and documents. The applications for those processes are submitted to the appropriate department for review and approval. These related reviews can be applied for so that review can occur concurrently with the development package application. However, it must be understood that, should the related application be approved subject to conditions or denied, this may affect the; 2-06.2.4 Concurrent Reviews The development package is designed to allow for concurrent review of any site related reviews. Concurrent review means that all plans and documents needed for the review are submitted as one package. Examples of site related reviews include but are not limited to: site plans, landscape plans, NPPO plans, water harvesting plans, grading plans, SWPPP plans, floodplain use permits, and overlay reviews. Separate applications are often required for the different site related reviews even if the plans are submitted concurrently; and, 2-06.2.5 Fees Fees in accordance with Section 4-01.0.0, Development Review Fee Schedule. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 2-06.4.8.A - Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system. 1. This comment was not addressed correctly. Provide a copy of the recorded Covenant Regarding Development and Use of Real Property. The covenant provided has not been recorded or the recordation information was not provided. COMMENT: As it appears this site is made up of two parcels a lot combination is required. Provide an approved copy of the Pima County approval form with your next submittal. As neither parcel can stand alone and meet all UDC requirements a lot combination is required or provide a recorded Covenant Regarding Development and Use of Real Property with your next submittal. 2-06.4.8.B - All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided. 2. The utility easement shown to be partially abandoned under Easement note 6 will need to be abandoned prior to approval of the development package. COMMENT: All easements shown to be abandoned will need to be abandoned prior to approval of the development package. Provide the recordation information on the plan. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2-06.4.9.L - All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval. 3. The access easement called out under Easement note 8 can be done via final plat, show them as such on the plan. COMMENT: All proposed easements will need to be recorded prior to approval of this development package. Provide the recordation information on the plan. 2-06.4.9.U - Indicate graphically, where possible, compliance with conditions of rezoning. 4. This comment was not addressed COMMENT: The one (1) no access easement required under Rezoning condition must be recorded prior to approval of the tentative plat. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 05/13/2016 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | Verify that DDO conditions on sheet LS-1 are accurate and if applicable, are met on the proposed plans. |
| 05/16/2016 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 05/18/2016 | PGEHLEN1 | ENV SVCS | REVIEW | Approv-Cond | Revise the TSMR approval date to 2/3/2016. Add the modification requested for the pedestrian circulation must be added to the TSMR general note. |
| 05/18/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 05/18/2016 | PGEHLEN1 | PIMA COUNTY | WASTEWATER | Reqs Change | April 25, 2016 To: Ken Perry, P.E. Perry Engineering, Inc. 505 W Wetmore Rd Tucson, AZ 85705 Thru: Patricia Gehlen City of Tucson Development Services ____________________________________ From: Hussein Al Zubaidi, EPT, PCRWRD (520) 724-6404 Subject: 1ST AVE SELF STORAGE II LOTS 1-3 P16WS00009 (DP15-0117) Tentative Plat - 2nd Submittal The Pima County Regional Wastewater Reclamation Department (PCRWRD) has reviewed the proposed sewer design for the above-referenced project. The Pima County Regional Wastewater Reclamation Department hereby conditionally approves the above referenced submittal of the Preliminary Sewer Layout (PSL), based upon PCRWRD Engineering Design Standards (EDS) 2016 with the following conditions: 1. All Sheet: PCRWRD requires a blanket access easement through entire property for the existing public sanitary sewer on site. 2. Sheet C3: (Keynote 19) the proposed concrete drainage spillway call out for increased concrete thickness to 6" per EDS 2016 Sec.7.6. The revisions can be submitted by PDF. If you have any questions regarding this matter please contact me at your convenience. Cc. Lorenzo Hernandez, P.E., RWRD Francisco Galindo, P.E., RWRD Tom Porter, P.E., RWRD |
| 05/19/2016 | AHINES2 | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All items requested by review staff 3) All items needed to approve these plans |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/08/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |