Permit Number: DP15-0108
Parcel: 11714257C

Address:
550 S STONE AV

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP15-0108
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/21/2015 CPIERCE1 START PLANS SUBMITTED Completed
10/22/2015 MARTIN BROWN COT NON-DSD FIRE Approved
11/03/2015 DAVID RIVERA ZONING HC REVIEW Reqs Change See zoning comments.
11/03/2015 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: David Rivera
Principal Planner

PROJECT: DP15-0108
Address: 550 S Stone Avenue
Development Package: Civic Use - Jewish History Museum

TRANSMITTAL DATE: November 3, 2015

DUE DATE: November 19, 2015

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.


1. Follow up comment to previous comment 27: THe slopes on the proposed ramps were not labled. Label the slopes and resubmit the drawings for zoning review. Zoning is willing to review and approve the plans over the counter once the changes have been made.

2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

27. COMMENT: During a site visit it was noted that there is construction ongoing on the site. The plan depicts an existing ramp system. However it does not appear that ramp system as depicted on the plan is consistent or currently accurate with what may be being built on site. Revise as necessary.

Provide the cross and running slopes of the pedestrian accessible route. Indicate if access point to the building area flush with the landings. Indicate on the plan where the accessible/pedestrian route is provided to the new structure.

Dimension the width of the sidewalk/ramp system and the width and length of the turnaround landings. If necessary include a blowup detail drawing of the ramp system with dimensions, direction of travel and slopes, call out for rails and an elevation detail drawing of the ramp and hand rails. Refer to Chapter 4 in ICC A117.1-2009 for requirements.
*********************************************************************

If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package site plan and any requested documents.
11/13/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
11/17/2015 ANDREW CONNOR LANDSCAPE REVIEW Approved
11/18/2015 LOREN MAKUS ENGINEERING REVIEW Approved
11/20/2015 BVIESTE1 ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required.
Please resubmit the following items:

1) 4 Rolled sets of the plan
2) All items requested by review staff
3) And all items needed to approve the plan
11/20/2015 FDILLON1 DESIGN PROFESSIONAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
12/04/2015 EGALLET1 OUT TO CUSTOMER Completed