Permit Number: DP15-0103
Parcel: 13213087B

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP15-0103
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/14/2016 PGEHLEN1 START PLANS SUBMITTED Completed
01/15/2016 STEVE SHIELDS ZONING REVIEW Approved
01/15/2016 ELEIBOL1 ENV SVCS REVIEW Approved From: "Ken Perry" <kperry@perryengineering.net>
To: "'Elizabeth Leibold'" <Elizabeth.Leibold@tucsonaz.gov>,
<lins-tucson@chenarchitects.com>,
"'Patricia Gehlen'" <Patricia.Gehlen@tucsonaz.gov>,
"'Steve Shields'" <Steve.Shields@tucsonaz.gov>
Cc: "'Robert Sherry'" <Robert.Sherry@tucsonaz.gov>
Subject: RE: DP15-0103 / 5th Plan Review
Date: Fri, 15 Jan 2016 08:37:53 -0700

The DP is now acceptable to ESD.

Ken
01/15/2016 STEVE SHIELDS ZONING-DECISION LETTER REVIEW Approved
01/15/2016 ELEIBOL1 ENGINEERING REVIEW Approved DATE: January 15, 2016
SUBJECT: Lin's Restaurant at TMP Engineering Review
REVIEWER: Elizabeth Leibold, P.E. CPM, CFM
LOCATION: 1068 E TUCSON MARKETPLACE BL
ACTIVITY NUMBER: DP15-0103

SUMMARY: The Drainage Report, updated sheets of the Development Package, redlines, and copy of Environmental Services email was reviewed and found acceptable. Planning and Development Services Department Engineering Division recommends approval of the development package and grading permit application.
The following 8 conditions apply to permit DP15-0103:
1) Two copies of the SWPPP Report shall be submitted to Engineering Reviewer and one copy of accepted report shall be provided at Pre-construction Meeting.
2) Call for SWPPP inspection and Grading Pre-construction meeting. For a PDSD Engineering Inspections, call IVR (791-3111), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888. Call for inspections of SWPP control installation, stormdrain improvements, scuppers, and other inspections as discussed with Inspector at time of Pre-con meeting.
3) There shall be no disturbance outside of the approved grading limits. Any grading outside of the grading limits requires separate grading permit or a submittal, review, and approval for separate permits.
4) There shall be positive gradient provided from edge of building away from building and toward scuppers. Positive gradient shall be provided in periphery graded areas around site so that no ponding occurs.
5) Temporary SWPP controls shall be maintained during construction until all permanent control installations are completed.
6) If there are any revisions to design or construction, contact PDSD Engineering Inspector or PDSD Engineering Civil Engineer to discuss proposed change to determine whether one of the following may be needed: notation of change may be needed in system and later as-built, details of change, or revised plan submittal.
7) With as-built submittal, provide copy of Revision application with cover letter explaining revisions as as-built conditions. Provide also certification statements from Registrant (for overall project substantial completion as well as drainage infrastructure installation) prior to approval of final grading. Include as-built elevations of invert elevations of stormdrain pipe system, inverts of inlet and outlets of surface drainage system, FFE of building, and other elevations as deemed necessary by RLS.
8) Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all erosion control measures, have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed.
If you have questions, call me at 837-4934.
Elizabeth Leibold, P.E., CPM, CFM
Civil Engineer
Engineering Division
Planning & Development Services Department
elizabeth.leibold@tucsonaz.gov
837-4934
01/15/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
01/21/2016 EGALLET1 OUT TO CUSTOMER Completed