Permit Number: DP15-0102
Parcel: 305972280

Review Status: Completed

Review Details: SITE and/or GRADING

Permit Number - DP15-0102
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/14/2015 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
Principal Planner

PROJECT: DP15-0102
Rincon Knolls - Phase II - The Vistas at Rincon Knolls
Grading Plan

TRANSMITTAL DATE: July 16, 2015

DUE DATE: August 4, 2015

COMMENTS:

01. Zoning has reviewed the grading plan and compared to the tentative plat as it pertains to the zoning review purview. While zoning finds that the grading plan is consistent with the TP zoning cannot approve the GP at this time.

02. Zoning has identified several burrows with the grading limits that potentially will have to be relocated. Has an initial site inspection of the site been completed by the Registered Biologist and if so what were the findings. Any documents related to the Tortoise burrows shall be provided with the next submittal.

03. It is my understanding that there was a study done after 2006 somewhere around the year 2009. Provide any documents for that study with the next submittal. Include sheets 20 and 21 of the DP13-0169 with the next submittal. If in fact there is an newer study provide any documentation and survey sheets of the burrows.


If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Grading Plan and Requested documents
07/17/2015 DRIVERA1 ADA REVIEW Passed
07/17/2015 DAVID RIVERA H/C SITE REVIEW Approved
07/24/2015 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change Provide any documents related to the Tortoise burrows study with the next submittal.

Include sheets 20 and 21 of DP13-0169.

If newer study exists provide documentation and survey sheets.

Ensure that all Zoning and Engineering comments and concerns are addressed.

Additional comments may apply
07/24/2015 ANDREW CONNOR NPPO REVIEW Reqs Change Provide any documents related to the Tortoise burrows study with the next submittal.

Include sheets 20 and 21 of DP13-0169.

If newer study exists provide documentation and survey sheets.

Ensure that all Zoning and Engineering comments and concerns are addressed.

Additional comments may apply
07/27/2015 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Revise the notes to reflect the Technical Standards instead of the Development Standards.
2. Provide surface material description and construction information for the temporary fire access road.
3. Several lots appear to be in violation of the differential grading standard of the Technical Standards. The excess fill must be approved by the director (or designee) as outlined in the Technical Standards Manual 2-01.8.1.A.
07/31/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Verify the need for a backwater valve at the following lots: 172, 184, 197, 224, 231, 237, 245, 246, 247, 248, 258, 259, 261, 289, 290, 291, 321, 340, and 342. If the FFE is 12" or more above the rim elevation of the next upstream manhole, no backwater valve shall be installed. Reference: Section 715.1, IPC 2012.
08/05/2015 MARTIN BROWN FIRE REVIEW Reqs Change Add note that was on DP 13-0169 submittal indicating if and when phase two proceeds, secondary access to development will be provided by the developer.KENB

Final Status

Task End Date Reviewer's Name Type of Review Description
11/20/2015 AROMERO4 APPROVAL SHELF Completed
11/20/2015 AROMERO4 OUT TO CUSTOMER Completed
11/20/2015 AROMERO4 REJECT SHELF Completed