Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP15-0097
Parcel: 129020010

Review Status: Completed

Review Details: DEV PKG - RESUBMITTAL

Permit Number - DP15-0097
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/04/2015 AROMERO4 START PLANS SUBMITTED Completed
08/20/2015 JASON GREEN ENGINEERING REVIEW Reqs Change DATE: August 20, 2015
DUE DATE: September 01, 2015
SUBJECT: Broadway Village Development Plan Package- 2nd Engineering Review
TO: Metro TED; Attn: Lisa Bowers
LOCATION: 3000 E Broadway Blvd; T14S R14E Sec17
REVIEWERS: Jason Green, CFM
ACTIVITY: DP15-0097

SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Development Package, Drainage Statement (Cypress Civil Development, 11JUN15), and Stormwater Pollution Prevent Plan (Cypress Civil Development, 11JUN15). Engineering Division does not recommend approval of the Development Package at this time. This review falls under the Unified Development Code (UDC), Administration Manual (AM) and Technical Standards Manual (TSM). Refer to the following link for further clarification:
http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

The following items need to be addressed:

SITE PLAN:

9) Acknowledged: AM Sec.2-06.4.9.H.1: A separate PIA maybe required from TDOT for all improvements within the right-of-way, provide written approval for all improvements prior to development package approval.

15) Restated: AM Sec.2-06.4.9.H.5.c: Provide the required executed maintenance agreement as stated in Section B.4 of the PAD for the proposed access and maneuvering of the loading space within the right-of-way of Eastbourne Avenue. Agreement must be signed, notarized and recorded prior to DP approval.

20) Restated: AM Sec.2-06.4.9.S: Revise the development package to label the required handicap access ramp within the right-of-way of Eastbourne Avenue along the south side of the driveway entrance. Provide Keynote #21 in plan view at this location to reference the PC/COT Standard Detail for Public Improvement. This also applies to the south side of Manchester and Eastbourne Ave.

21) Restated: AM Sec.2-06.4.9.S: Revise the development package to provide the recordation information for the public sidewalk located along the eastside of Eastbourne Avenue that falls within the private property. Public access cannot be on private property without a pedestrian easement. After review of the PAD it does not appear that this was covered and the recordation information or a new easement will be required. Provide the recordation information in plan view for the easement once recorded.

23) Restated: AM Sec.2-06.4.9.T: Provide the required executed maintenance agreement as stated in Section B.4 of the PAD for the proposed access and maneuvering of the refuse enclosure within the right-of-way of Manchester Street. The proposed location of 2 refuse enclosures fall offsite and within the public right-of-way. Provide an easement for construction, maintenance and use of the right-of-way from TDOT and Real Property. Agreement must be signed, notarized and recorded prior to DP approval.

SWPPP:

25) The proposed SWPPP meets the minimum requirements of the AzPDES 2013 Construction General Permit (CGP). However the SWPPP and Exhibits can not be stamped approved until approval of the development plan package. Provide both copies with resubmittal for stamp approval.

GENERAL COMMENTS:

Please provide a revised Development Package that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

For any questions or to schedule meetings call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services Department
08/24/2015 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Broadway Village
Development Package (2nd Review)
DP15-0097

TRANSMITTAL DATE: August 24, 2015

DUE DATE: September 1, 2015

2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

1. COMMENT: It does not appear that the bicycle parking details address the requirements of UDC Article 7.4.9.B.2.g.

Additional Comments

2. Zoning acknowledges that a unexecuted copy of the TRE was provided. Provide a copy of the executed TRE with your next submittal. COMMENT: Per PAD 19, Part 3.B.4 provide approvals and copies of the required maintenance agreements for all proposed improvements located within the right-of-ways.

Once the above comments have been addressed Zoning is willing to provide and over-the-counter review. Call or email to schedule and appointment for this review.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package, Executed TRE
08/25/2015 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
08/31/2015 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change Ensure that all Zoning and Engineering comments are addressed prior to Lanscape approval.
09/01/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change For the three sewer connections located along Country Club Road, the rim elevation of the next upstream sanitary manhole (MH#8178-30A, 2481.23') less than 12" below the first floor elevation (2481.85') of the eastern building. The sewer connection shown on Broadway Boulevard is located downstream of MH#8178-30, 2481.79') and the rim elevation of the manhole is higher than the first floor elevations (2479.45' to 2481.70') of the western building. Provide a note on the plans requiring the installation of a backwater valve when future plumbing activities take place. Reference: Section 715.1, IPC 2012, as amended by the City of Tucson. [Initial comment: Revise the site drawing to include the following information:
a. The points of connection to existing public sewers.
b. The first floor elevation for the buildings
Reference: City of Tucson Administrative Manual No. 2-06.0.0, Section 4.8 and Section 107.2.13, IBC 2012.]
09/01/2015 SSHIELD1 ZONING HC REVIEW Approved
09/02/2015 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) All items requested by review staff
3) All items needed to approve this plan.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/03/2015 KROBLES1 OUT TO CUSTOMER Completed