Permit Number: DP15-0052
Parcel: 14041128A

Review Status: Completed

Review Details: GRADING

Permit Number - DP15-0052
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/31/2015 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
Principal Planner

PROJECT: DP15-0052
HomeGoods Distribution Center
Grading Plan

TRANSMITTAL DATE: March 31, 2015

DUE DATE: April 8, 2015

COMMENTS: See the following comments

01. Zoning has reviewed the grading plan as it pertains to the zoning review purview. While the plans are consistent with the current conditionally approved Development Package zoning has the following comments. The grading plan cannot be approved until the comments area addressed.

02. List the on the cover sheet, the TSMR case number date of approval and any conditions of approval.

03. Label the Easement recordation information for the bus stop/pedestrian area.


If you have any questions about this transmittal, please call David Rivera, (520) 837-4957
04/01/2015 ANDREW CONNOR NPPO REVIEW Reqs Change Identification and Descriptive Data

All improvements and site information, such as adjacent rights-of-way and property lines, shown on the grading plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the grading plan which will then be resubmitted for review. Ensure that all changes to the (DP or tentative plat) are reflected on the grading plan.

Ensure that all Zoning and Engineering comments and concerns are addressed prior NPP / Landscape approval.
04/07/2015 LOREN MAKUS ENGINEERING REVIEW Reqs Change Provide recordation of easement or right-of-way dedication for bus stop and sidewalk along Corona Road.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/28/2015 KROBLES1 OUT TO CUSTOMER Completed