Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE/GRADING ALL
Permit Number - DP15-0015
Review Name: RESUB - SITE/GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/03/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: 3819 S. 16th Avenue Development Package (Revised for DDO comments only) DP15-0015 TRANSMITTAL DATE: April 3, 2015 This site is located in the R-2 zone (UDC 4.7.9). Multi-family residential is a permitted use in this zone (Table 4.8-2). ). See Use Specific Standards 4.9.7.B.6, .9 & .10. 1. COMMENT: Per UDC Section 6.4.5.C.1.a Within established areas, the minimum required front street perimeter yard is 20 feet or one and one-half the height of the proposed wall (H), measured from the street property line, whichever is greater, up to a maximum of 90 feet. Based on a wall height of, 9'-0" the required front street perimeter yard setback to President Street is 20'-0". Proposed perimeter yard setback from the southwest corner to the front street perimeter yard is 19'-1" 2. COMMENT: Per UDC TABLE 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES, R-2 Zone, Nonres Use Res or Nonres Zone, the required perimeter yard setback Is 10' or ¾(H), the greater of the two dimensions applies. Based on a wall height of, 9'-0" the required perimeter yard setback to the north property line is 10'-0", proposed is 5'-0". If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov |
| 05/22/2015 | ERIC NEWCOMB | H/C SITE | REVIEW | Approved | |
| 05/22/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 05/22/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 05/22/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 05/26/2015 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 05/26/2015 | ANDREW CONNOR | NPPO | REVIEW | Approved |