Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SITE and/or GRADING
Permit Number - DP14-0226
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2015 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
01/05/2015 | JASON GREEN | ENGINEERING | REVIEW | Reqs Change | DATE: January 5, 2015 DUE DATE: January 9, 2015 SUBJECT: Alamo Crossing Private Paving Development Plan Package- Engineering Review TO: Oasis Tucson, Attn: Zach Hinman LOCATION: 6105 E Pima St; T14S R14E Sec01 REVIEWERS: Jason Green, CFM ACTIVITY: DP14-0226 SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Development Plan Package. Engineering Division does not recommend approval of the Development Plan Package at this time. This review falls under the Unified Development Code (UDC), Administration Manual (AM) and Technical Standards Manual (TSM). Refer to the following link for further clarification: http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az The following items need to be addressed: SITE PLAN: 1) AM Sec.2-06.4.3: The relevant Development Plan Package case number (DP14-0226) may be added to the lower right hand corner of the plan on all sheets. 2) AM Sec.2-06.4.9.M: Verify that the private paving and public sewer plan matches the last approved development plan package (Tentative Plat) and under review Grading Plan Package in design, locations, dimensions and construction details for the project. All 3 plan sets should match for verification purposes. The private paving development plan package cannot be approved until approval of the grading development plan package. GENERAL COMMENTS: Please provide a revised Development Plan Package that addresses the comments provided above. For any questions or to schedule meetings call me at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division Planning & Development Services Department |
01/08/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | A separate permit is required for the installation of a private sewer collection system handling over 3,000 gallons per day and will require a review of the system by the Pima County Department of Environmental Quality Reference Title 18, R18-9-E302, 4.02 General Permit, Arizona Administrative Code. |
01/08/2015 | KEN BROUILLETTE | FIRE | REVIEW | Reqs Change | Please indicate on site plan or drawings the location of existing and proposed fire hydrants for this project. |
01/08/2015 | RONALD BROWN | H/C SITE | REVIEW | Reqs Change | SHEET 3 1. At note 11 please be aware that detetectable warnings are required only at transportation platforms. They be installed at owner's option however the installation must be as per the 2009 ICC A117.1, Sections, 406.12, 13, 14 and 705. SHEET 4 2. Detail H: a. Comment 1 above is applicable for the curb ramps at the INTERIOR marked crossing. b. At the most easterly sidewalk ramp insure a 5' x 5' landing as required by ICC A117.1, Section 405. c. Reference the accessible signage to detail O/6 3. Details G and I a. Comment 1 above is applicable b. Insure a 5' x 5' turn around landing at all 90 degree turn ramps as required by ICC A117.1, Section 405. END OF REVIEW |
12/10/2014 | RBROWN1 | ADA | REVIEW | Passed | |
12/29/2014 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Alamo Crossing Development Package, Paving Plan Only (1st Review) DP14-0226 TRANSMITTAL DATE: December 29, 2014 DUE DATE: January 09, 2015 1. The paving plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning is not sure why this plan has been submitted as all required info should be on grading plan DP14-0197. 3. Zoning cannot approve the paving plan until approved by the Engineering review section. 4. Zoning will re-review the paving plan on the next submittal to insure compliance with the approved tentative plat. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
12/30/2014 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | Ensure that all Zoning and Engineering comments and concerns are addressed prior to Landscape approval. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/16/2015 | KROBLES1 | APPROVAL SHELF | Completed |
01/16/2015 | KROBLES1 | OUT TO CUSTOMER | Completed |
01/16/2015 | CPIERCE1 | REJECT SHELF | Completed |