Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP14-0167
Parcel: 141220250

Address:
9095 S RITA RD

Review Status: Completed

Review Details: DEV PKG - REVISION

Permit Number - DP14-0167
Review Name: DEV PKG - REVISION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2017 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Steve Shields Principal Planner
PDSD Zoning Review Section

PROJECT: Interstate Commerce Park Lots 8 -11
Development Package (Revision #3)
DP14-0167

TRANSMITTAL DATE: December 27, 2016

DUE DATE: January 10, 2017

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

Section

1. Follow Up Comment to Previous Comment 2: List as a general note on the cover sheet the TSMR and DDO case number, date of approval, modifications requested and conditions of approval on the cover sheet or add a general note stating where the information for the TSMR and DDO can be found on the plans.

Revise the T16SA case number in the title block of the landscape sheets to T16SA00403. The case number on the Notice of Decision letter was typed incorrectly. List both T16SA case numbers in the title block of all plan sheets.


PREVIOUS COMMENT 2: 2-06.4.9.X - The Design Development Option (DDO) will need to be approved prior to approval of the development package revision.
01/09/2017 LOREN MAKUS ENGINEERING REVIEW Approved
01/10/2017 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change Please address zonings comments and resubmit the plans for signature.

Thanks
12/23/2016 LBOJORQ1 START PLANS SUBMITTED Completed
12/29/2016 ANDREW CONNOR LANDSCAPE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
01/11/2017 KROBLES1 OUT TO CUSTOMER Completed