Permit Review Detail
Review Status: Active
Review Details: SITE and/or GRADING
Permit Number - DP14-0084
Review Name: SITE and/or GRADING
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/20/2014 | ANY | FIRE | REVIEW | Active | |
05/20/2014 | ANY | NPPO | REVIEW | Active | |
05/20/2014 | Any | LANDSCAPE | REVIEW | Active | |
05/20/2014 | ANY | PLUMBING-COMMERCIAL | REVIEW | Active | |
05/20/2014 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: 630 E. 9th Street Development Package (1st Review) DP14-0084 TRANSMITTAL DATE: May 20, 2014 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. 2-06.4.9.O - All applicable building setback lines, such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown. 1. COMMENT: The minimum setback to the front street perimeter property line is the greater of twenty (20) feet, or one and one-half (1 ½) the height of the proposed wall (UDC 6.4.5.C.1.a). Proposed front street perimeter yard setback is 0'-0". Design Development Option required. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package . |
05/20/2014 | ANY | ADA | REVIEW | Active | |
05/20/2014 | JASON GREEN | ENGINEERING | REVIEW | Needs Review | |
05/20/2014 | Any | H/C SITE | REVIEW | Active |