Permit Number: DP14-0033
Parcel: 13817038A

Address:
480 E ELVADO RD

Review Status: Completed

Review Details: RESUB - SITE/GRADING ALL

Permit Number - DP14-0033
Review Name: RESUB - SITE/GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/26/2014 JASON GREEN ENGINEERING REVIEW Reqs Change DATE: August 26, 2014
DUE DATE: September 12, 2014
SUBJECT: Water Treatment Facility Development Plan Package- 2nd Engineering Review
TO: Howard Woolsoncroft
LOCATION: 480 E Elvado Rd; T15S R13E Sec13
REVIEWERS: Jason Green, CFM
ACTIVITY: DP14-0033

SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the proposed Development Plan Package, Hydrologic/Hydraulic Report (Tetra Tech, Inc., 05DEC12), Addendum to Geotechnical Engineering Report (Terracon, 18SEP13), Floodplain Use Permit (T14OT01041) and Stormwater Pollution Prevention Plan (Arcadis, APR14). Engineering Division does not recommend approval of the Development Plan Package at this time. This review falls under the Unified Development Code (UDC), Administration Manual (AM) and Technical Standards Manual (TSM). Refer to the following link for further clarification:
http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

The following items need to be addressed:

SITE PLAN:

1) Complied.
2) Complied.
3) Complied.
4) Complied.
5) Complied.
6) Complied.
7) Complied.
8) Complied.
9) Complied.
10) Complied.
11) Complied.
12) Complied.
13) Complied.
14) Complied.

15) Restated: AM Sec.2-06.4.8.I: Revise the development plan package to include the floodplain information, including the 100 year water surface elevation in plan view. It is acknowledged that the new floodplain limits have been added to the plan however the WSEL could not be located, revise.

16) Restated: AM Sec.2-06.4.9.H.1: Revise the development plan package to label and dimension the proposed driveway setbacks from the MS&R street intersection per Chapter 25 of the Tucson Code Sec.25-38 and the Tucson Access Management Guidelines (TAMG). Sheet 8 shows a new driveway apron located along the east property line that does not appear to meet the 80-foot setback from South Nogales Highway as required per the MS&R plan and TAMG, revise.

17) Restated: AM Sec.2-06.4.9.H.1: Revise the development plan package to label the required vertical curbing for the proposed curb returns within the right-of-way for the driveway entrance. Provide a Keynote or detail for the required vertical curbing to meet the minimum requirements of PC/COT Standard Details for Public Improvements. It is acknowledged that the vertical curbing has been labeled in the right-of-way however the curb returns from the right-of-way to the onsite driveway still need to be clearly labeled as vertical or concrete headers, revise.

18) Complied.
19) Complied.
20) Complied.
21) Complied.
22) Complied.
23) Complied.
24) Complied.
25) Complied.

26) Restated: AM Sec.2-06.4.9.N.6: A Floodplain Use Permit application has been submitted for the proposed work within the existing 100-year floodplain limits, however the permit cannot be approved or conditioned until approval of the development plan package.

27) Complied.
28) Complied.
29) Complied.


GENERAL COMMENTS:

Please provide a revised Development Plan Package that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

For any questions or to schedule meetings call me at 837-4929.

Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services Department
08/28/2014 MICHAEL ST. PAUL ZONING REVIEW Approved
09/11/2014 ANDREW CONNOR LANDSCAPE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/11/2014 AROMERO4 APPROVAL SHELF Completed
09/11/2014 AROMERO4 OUT TO CUSTOMER Completed
09/11/2014 CPIERCE1 REJECT SHELF Completed