Permit Number: DP14-0016
Parcel: 11615088L

Review Status: Completed

Review Details: RESUB - SITE and/or GRADING

Permit Number - DP14-0016
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/20/2014 ELIZABETH LEIBOLD ENGINEERING REVIEW Approved DATE: March 20, 2014
TO: Ryan Stucki P.E, EEC Engineering
SUBJECT: St Mary's Onsite Parking Lot Site/Grading Plan Engineering Re-submittal Review
LOCATION: 395 N Silverbell Rd
ACTIVITY NUMBERS: T14OT00163, DP14-0016, (Site plan: DP14-0006)

SUMMARY: Engineering has reviewed the resubmittal package. Previous temporary use permitting has occurred for this parking area; this project proposes final grading and paving improvements for parking. Engineering recommends approval and issuance of grading permit and floodplain use permit. The conditions will apply to the grading permit DP14-0016.

GRADING PERMIT CONDITIONS:
The following 8 conditions apply to permit DP14-0016:
1) Call for Pre-construction meeting, intermediate and final inspections.
2) This plan acts as the Grading Plan for reconstructed parking lot in the center of the hospital campus.
3) Temporary erosion/stormwater controls may be used at entrance to existing pipe and be field adjusted with discussions with Contractor and Engineer of record and Inspector as necessary.
4) There shall be no disturbance outside of the approved disturbance/grading limits.
5) Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact PDSD Engineering to discuss changes in grading design.
6) If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
7) The permitee shall notify PDSD when the grading operation is ready for final grading inspection.
8) Prior to request for final grading inspection approval, all erosion control improvements shall be installed and accepted by PDSD including rock / established revegetation for all disturbed areas if not improved as per approved plan. As-builts shall be provided.

Please call me for clarifications at 837-4934.

Elizabeth Leibold, P.E.
Civil Engineer
Engineering Division
Planning & Development Services