Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP14-0010
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/19/2014 | CPIERCE1 | START | PLANS SUBMITTED | Completed | |
03/20/2014 | DAVID RIVERA | ZONING | REVIEW | Approved | |
03/27/2014 | PGEHLEN1 | COT NON-DSD | ENVIRONMENTAL SERVICES | Approved | Patricia, Jeff has made the corrections I requested and I can approve the DP once the revised plans are made part of the submittal. Ken From: Jeff Behrana [mailto:JBehrana@optimuscdg.com] Sent: Tuesday, March 18, 2014 10:52 AM To: 'Ken Perry'; 'David Rivera' Cc: Patricia.Gehlen@tucsonaz.gov; 'Lisa Bowers' Subject: RE: mattress Firm Dear Ken & David, Per my conversatioopn with Trish, I am trying to secure help from both of you to get our DP signed off so we can get permits. David R David, I already took care of your comments last Friday and cleaned up the key note call outs to your satisfaction as per our e-mail correspondence. Trish wanted to be cc so I am reiterating it.. I have updated that sheet accordingly (attached). I will have Lisa Hand carry that sheet for you over the counter once ken signs off on it. Ken P. Ken attached are the revised PDF’s for your review and approval based on your comments below and my responses in red 1. Add a note that the gates must not contain a center post for support to Detail 3 on Sheet 5.—Done –keynote #7 under 3/G-1 2. Show the 20 ft. clear dimension required inside the enclosure on Detail 3 on Sheet 5. Done 3. Show the existing bollards as denoted by keynote number 1. Done- 4. Add to the concrete note for the apron that the slab must have rebar reinforcing per Figure 3A in TSM Section 8. Done –keynote # 2 under 3/G-1. I also updated the detail call out on sheet 4(DTl-1) attached 5. The gate cover is noted as 18 ga. steel. Change this to 1/8” steel plate. Done-keynotes 6&7 under 1/G-1 and 2/G-2. I will send full size with my stamp on it to Lisa, if everyone is Ok per this e-mail thanks for the assistance . Ken Jamsheed (Jeff) D. Behrana, P.E. (AZ, CA & IN) Managing Partner Optimus Civil Design and Survey LLC 4650 E. Cotton Center Blvd., Suite 200 Phoenix, Arizona 85040 Office: 602.286.9300 Direct: 602.393.5234 Cell: 602.677.7171 Fax: 602.286.9350 jbehrana@optimuscdg.com website: www.optimuscdg.com -------------------------------------------------------------------------------- From: Ken Perry [mailto:kperry@perryengineering.net] Sent: Tuesday, March 18, 2014 8:27 AM To: Jeff Behrana Cc: Patricia.Gehlen@tucsonaz.gov Subject: RE: mattress Firm Jeff, I have taken a look at your resubmittal. There are a few things that need to be addressed. I will send my comments into DSD today. 6. Add a note that the gates must not contain a center post for support to Detail 3 on Sheet 5. 7. Show the 20 ft. clear dimension required inside the enclosure on Detail 3 on Sheet 5. 8. Show the existing bollards as denoted by keynote number 1. 9. Add to the concrete note for the apron that the slab must have rebar reinforcing per Figure 3A in TSM Section 8. 10. The gate cover is noted as 18 ga. steel. Change this to 1/8” steel plate. Ken |
03/27/2014 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approved |