Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Active
Review Details: REVISION - GRADING
Permit Number - DP14-0002
Review Name: REVISION - GRADING
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/03/2014 | ELEIBOL1 | ENGINEERING | REVIEW | Approved | It was determined that the proposed SFR development was not within the jurisdictional floodplain limits and therefore no El Cert was required for this house. Elevations of pad were as-built higher than approved grading plan. Certification letters were also submitted for Final Revised Grading Plan submital. E Leibold P.E., CPM |
10/03/2014 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
10/03/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
10/03/2014 | ELEIBOL1 | ENGINEERING | REVIEW | Approved | Additional rip rap at north slope was added per discussions with EOR and Inspectors after completion of grading construction. (Not shown on as-builts). EOR stated that non-woven geotextile was not required for the north scupper drain on this project 3OCT14. EOR forgot seal for geotextile clarification letter, so added note to as-builts that were originally sealed for design by EOR (but sealed for as-built elevations by Doug Schneidner R.L.S. |