Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP14-0002
Parcel: 116300220

Review Status: Active

Review Details: REVISION - GRADING

Permit Number - DP14-0002
Review Name: REVISION - GRADING
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
10/03/2014 ELEIBOL1 ENGINEERING REVIEW Approved It was determined that the proposed SFR development was not within the jurisdictional floodplain limits and therefore no El Cert was required for this house. Elevations of pad were as-built higher than approved grading plan. Certification letters were also submitted for Final Revised Grading Plan submital. E Leibold P.E., CPM
10/03/2014 ANDREW CONNOR NPPO REVIEW Approved
10/03/2014 MICHAEL ST. PAUL ZONING REVIEW Approved
10/03/2014 ELEIBOL1 ENGINEERING REVIEW Approved Additional rip rap at north slope was added per discussions with EOR and Inspectors after completion of grading construction. (Not shown on as-builts). EOR stated that non-woven geotextile was not required for the north scupper drain on this project 3OCT14. EOR forgot seal for geotextile clarification letter, so added note to as-builts that were originally sealed for design by EOR (but sealed for as-built elevations by Doug Schneidner R.L.S.