Permit Number: DP13-0229
Parcel: 141366950

Review Status: Completed

Review Details: GRADING

Permit Number - DP13-0229
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/05/2013 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: La Estancia De Tucson - Blocks 49 - 52
Grading Plan (1st Review)
DP13-0229

TRANSMITTAL DATE: December 05, 2013

DUE DATE: December 17, 2013

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

2-06.1.0 GENERAL

2-06.3.5 - A three-inch by five-inch space shall be reserved in the lower right quadrant of each sheet for an approval stamp.

1. COMMENT: Provide the COT Development Package PDSD Approval stamp on all sheets of the development package.

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

2. COMMENT: Provide the grading plan case number, DP13-0239, and the plat case number, S07-178, adjacent to the title block on each sheet.

3. Additional Comments: Zoning cannot approve the grading plan until the plan is approved by the Engineering and Landscape review sections.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Grading Plan
.
12/13/2013 ELIZABETH EBERBACH ENGINEERING REVIEW Approv-Cond GRADING PERMIT CONDITIONS:
The following 10 conditions apply to this grading permit DP13-0229:

1) Submit floodplain use permit with copy of geotechnical/soils report for proposed excavations: S3-01 through S3-04, S3-08, S3-9, and S3-11, prior to issuance of grading permit. Otherwise these excavations are excluded from this grading permit.
2) Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
3) PDSD Inspector should inspect stockpile access area (and associated fencing) to the stockpile, temporary controls, stockpile location, and later stockpile height, at minimum. Discuss inspections with Inspector at Pre-con meeting at the site.
4) At time of SWPPP control installation, fencing will be required to be set up along both sides of access to stockpile area from Camino Boleadoras along Vuelta De Ocho Rios.
5) Copy of approved plan/permit DP13-0229 shall be kept at site at all times until final grading approval.
6) These sets of plans act as the approved final grading plans (sealed by David Little, P.E.) for La Estancia stockpile permit - all proposed excavations as shown on plans except for excavations: S3-01 through S3-04, S3-08, S3-9, and S3-11 (unless floodplain use permit is submitted).
7) Only the following additional disturbance may occur beyond the areas depicted on the approved plan; these areas include: one access area to the stockpile permit and associated limited access to remediation areas as determined only by soils/geotechnical engineer. There shall be no disturbance outside of the disturbance/grading limits as shown on approved grading plans. Disturbance outside these limits may result in Stop Work Order, fines, and / or require revised plan submittal & review.
8) If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
9) Revisions to the proposed work must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any changes in construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed. All work completed without approval is subject to Stop Work Order.
10) A copy of field reports and letters of certification from Soils/geotechnical Engineer of Record for project substantial completion is required to be submitted prior to final grading inspection.

If you have questions,

Elizabeth Leibold, P.E., CPM, CFM
Civil Engineer
Engineering Division
Planning & Development Services Dept
http://www.tucsonaz.gov/dsd/Site_Review/site_review.html
City of Tucson
(520) 837-4934
12/16/2013 ANDREW CONNOR NPPO REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
12/17/2013 SHANAE POWELL OUT TO CUSTOMER Completed
12/17/2013 CPIERCE1 REJECT SHELF Completed