Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUB - SITE and/or GRADING
Permit Number - DP13-0207
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/22/2014 | DAVID RIVERA | ZONING | REVIEW | Approved | |
02/03/2014 | RONALD BROWN | HC SITE | REVIEW | Reqs Change | ALL RESUBMITTAL COMMENTS ARE PRESENTED IN ALL CAPS SHEET 2 1. OK 2. Provide 1 "Van Accessible" parking space. Include a large scale detail showing all accessibility requirements. THIS IS A SELF SERVICE CAR WASH. ALL VACCUUM PARKING SPACES ARE PUBLIC PARKING. PLEASE PROVIDE ONE VAN ACCESSIBLE VACCUUM PARKING SPACE WITH AN AISLE CONNECTED TO THE ACCESSIBLE ROUTE TO THE SPEEDWAY RIGHT OF WAY. 3. A building permit will be required for the new canopies. Code requires a 1 hour fire separation rcmu fence between the new canopy that is within 10' of the property line, 2012 IBC, Table 602. PLEASE SHOW THE FENCE ALONG THE ENTIRE LENGTH OF THE CANOPY AND NOTE THE FIRE RATING AS REQUIRED BY CODE. CONSTRUCTION DETAILS MAY BE SUBMITTED WITH CANOPY CONSTRUCTION PERMIT. SHEET 4 4. OK 5. At detail "D": a. Change the 1:10 slope of the ramps to 1:12 maximum. b. Add a note requiring 5% maximum running slope at the marked crossing. IF FLARED SIDES OF THE CURB RAMP ARE RETAINED, PROVIDE A 1:10 MAXIMUM SLOPE AS PER 2009 ICC A117.1, SECTION 406.7. END OF RESUBMITTAL REVIEW |
02/03/2014 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/07/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
03/07/2014 | SHANAE POWELL | REJECT SHELF | Completed |