Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: DP13-0200
Parcel: 11446015A

Review Status: Completed

Review Details: RESUB - SITE and/or GRADING

Permit Number - DP13-0200
Review Name: RESUB - SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/28/2014 MARTIN BROWN FIRE REVIEW Approved
08/28/2014 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Sabino Road Baptist Church
Development Package/Scenic Corridor Zone Review (2nd Review)
DP13-0200

TRANSMITTAL DATE: August 29, 2014

DUE DATE: September 24, 2014

This plan was reviewed for full code compliance due to the expansion of a non-conforming use.

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

1. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 12, 2014 .

2. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)
Section

2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

1. This comment was not fully addressed. Provide some type of barrier along the south end of the southeast vehicle parking area, at the back-up spur. COMMENT: Per UDC Section 7.4.6.H.1 Barriers, such as post barricades or wheel stop curbing, are required in a vehicular use area to prevent vehicles from extending beyond the property lines, to prevent cars from damaging adjacent landscaping, walls, or buildings, overhanging adjacent sidewalk areas, and/or driving onto unimproved portions of the site. That said demonstrate how the requirements of this UDC section are met at the southeast corner of the site.

Once the above comment has been addressed Zoning is will to provide an over-the-counter review. Call or email to schedule an appointment for this review.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
.
09/10/2014 LOREN MAKUS ENGINEERING REVIEW Denied As previously commented provide barriers wherever vehicle use areas abut non-paved or non-vehicle-ise areas.
I will consider a review at the counter for this issue.
09/12/2014 RONALD BROWN HC SITE REVIEW Reqs Change See suggested sketch attached to site plan for accessible loading zone.
09/15/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Reprint the Utility Keynotes - at least one of the keynotes has been cut off from the view port.
09/17/2014 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change 5.3.4. SCENIC ROUTE BUFFER AREA

A. Requirement

1. A buffer area 30 feet wide, adjacent to the MS&R future right-of-way line.

Portion of the buffer is not 30' wide.

UNIFIED DEVELOPMENT CODE

ARTICLE 7: DEVELOPMENT STANDARDS

Whether or not required by this section, screens along a street frontage must be located on the development side of the street landscape border so that they do not obstruct the view of the street landscape border from the street.

Screening is front of required 30' buffer.

Canopy Trees in Vehicular Use Areas

An unpaved planting area, which must be a minimum of 34 square feet in area and four feet in width, must be provided for each canopy tree. Dimension planters within vehicle use areas.

ADMINISTRATIVE MANUAL SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS

Identification and Descriptive Data

All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan.

Ensure that all Zoning and Engineering comments and concerns are addressed.

Additional comments may apply