Review Details: RESUB - SITE/GRADING ALL
Permit Number - DP13-0196
Review Name: RESUB - SITE/GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/04/2014 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Tabernaculo Emanuel Development Package (3rd Review) DP13-0196 TRANSMITTAL DATE: February 4, 2014 DUE DATE: February 26, 2014 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above 1. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is October 09, 2014 2-06.4.0 CONTENT REQUIREMENTS 2-06.4.7.A.8.b - Percentage and area in square feet of building and accessory building coverage; 1. COMMENT: Per UDC TABLE 6.3-2.B: EXCEPTIONS TO THE R-1, R-2, R-3, MH-1, & MH-2 DIMENSIONAL STANDARDS, Religious Use, the maximum lot coverage allowed is 60%. Proposed lot coverage is 74.4% a Board of Adjustment for Variance is required to be approved prior to approval of this development package. If approved provide the following information on the development package; Board of Adjustment case number, date of approval, what was varied, conditions of approval. 2-06.4.9.H.2 - Show future and existing sight visibility triangles (SVTs). On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section. 2. The SVT's are not readable on this plan. COMMENT: The future SVTs shown on sheet 2 do not appear to be shown correctly. The SVTs should line up with the future curb. ADDITIONAL COMMENTS: COMMENT: Zoning acknowledges that a future site plan was recommended to address issues with the proposed entrance area/gate off of Los Reales Road. The "NEW WALL IF REQUIRED BY FUTURE ROW" does not meet the requirements for a FUTURE SITE PLAN. The future site plan should show how all requirements of AM 2-06 will be met at the time of widening. This includes PAAL width north of the future wall, revised parking calculations that show the required and provided when the future wall is put in. The future site plan should be a separate sheet. Along with the site plan a recorded MS&R covenant is required. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package . |
| 02/10/2014 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | Laith Alshami, Engineering and Floodplain Review, 02/10/2014, SUBJECT: Tabernaculo Emanuel DP13-0196, T15S, R13E, SECTION 13 RECEIVED: Development Plan Package and Drainage Report on January 28, 2014 The subject project has been reviewed. The Development Package is acceptable and it is hereby approved pertaining to Engineering and Floodplain Review. If you have any questions, I can be reached at 837-4933 or Laith.Alshami@tucsonaz.gov |
| 02/12/2014 | RONALD BROWN | H/C SITE | REVIEW | Reqs Change | Add two detectable warning strips at the edge of the PAAL for the new marked crossing from the two accessible parking spaces added at the Northeast corner of building 1 to the dumpster location. |
| 02/14/2014 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | ADMINISTRATIVE MANUAL SECTION 2-10.0.0: LANDSCAPE PLAN REQUIREMENTS Identification and Descriptive Data All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. The landscape plan will contain the following identification in the lower right corner of each sheet: Rezoning case; Subdivision case; Board of Adjustment case; Design Development Option case; Development Review Board (DRB) case; and/or, Any other relevant case number for reviews or modifications that affect the site. This site does not meet the following requirements. Variance is required. ARTICLE 7: DEVELOPMENT STANDARDS 7.6.4 LANDSCAPE STANDARDS Street Landscape Borders Minimum Width Street landscape borders must be a minimum of ten feet wide as measured from the street property line. On streets designated as Major Streets and Routes (MS&R), the street landscape border must be measured from the future MS&R right-of-way line as determined by Section 5.4.4, Establishment of MS&R Right-of-Way Lines and Gateway Routes. Street landscape borders must be located entirely on site, except that, if approved by the City Engineer or designee, up to five feet of the required ten foot width may be placed within the adjacentright-of-way area or within the Major Streets and Routes (MS&R) right-of-way area on MS&R streets. Ensure that all Zoning and Engineering comments and concerns are addressed. Additional comments may apply |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/14/2014 | SHANAE POWELL | OUT TO CUSTOMER | Completed |
| 03/14/2014 | GERARDO BONILLA | REJECT SHELF | Completed |