Permit Number: DP13-0142
Parcel: 12908001A

Address:
1695 E 21ST ST

Review Status: Completed

Review Details: RESUB - SITE/GRADING ALL

Permit Number - DP13-0142
Review Name: RESUB - SITE/GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/14/2013 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: David Rivera
Principal Planner

PROJECT: DP13-0142
1695 E. 21st Street
Storage Yard

TRANSMITTAL DATE: October 14, 2013

DUE DATE: November 7, 2013

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

This plan has been reviewed for compliance with the Development Package Standards listed in section 2-06 of the City of Tucson Administrative Manual. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC requirements are in the Unified Development Code and can be viewed at the same web link as above.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of the-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 2, 2014.



Section 2-06.4.7 General Notes - The following general notes are required. Additional notes specific to each plan are required where applicable.

Section 2-06.4.9 Information on Proposed Development

New Comment: Until the recordation has been recorded and the sequence number added to the site plan, zoning cannot approve the site plan. Zoning is willing to review and approve the DP Site Plan over the counter, with an appointment, on the next submittal to review the changes and approve the plan if possible. Call in advance to set up an appointment for the over the counter review.

Previous Comment: List as a note the number of vehicle parking spaces required and number provided. Draw and dimension the parking lot area including the parking spaces.

If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package site plan and any requested documents.
10/16/2013 KEN BROUILLETTE FIRE REVIEW Approved
10/23/2013 JASON GREEN ENGINEERING REVIEW Approved
10/25/2013 ANDREW CONNOR LANDSCAPE REVIEW Approved
10/31/2013 SPOWELL1 H/C SITE REVIEW Needs Review