Permit Number: DP13-0075
Parcel: 13323193C

Address:
750 N KOLB RD

Review Status: Completed

Review Details: SITE and/or GRADING

Permit Number - DP13-0075
Review Name: SITE and/or GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/30/2013 RBROWN1 ADA REVIEW Passed
06/11/2013 STEVE SHIELDS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Planning and Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Guadalajara Fiesta Grill - Storage Room and Trellis Additions
Development Package (1st Review)
DP13-0075

TRANSMITTAL DATE: June 11, 2013

DEVELOPMENT PLAN COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Unified Development Code (UDC), Administrative Manual (AM) & Technical Standards Manual (TSM) were addressed.

1. This site was reviewed for full code compliance for the areas of change only.

2. Remove the development package from the building plans as they are separate submittals. Zoning acknowledges that these reviews can run concurrently.

3. As this development plan has not been approved remove all revision clouds from the plan.

The following comments are based on the requirements of Administrative Manual (AM) 2-06.0. The following comments are based on sheet 1 of 2;

4. A.M. 2-06.3.8 Provide a north arrow and the scale of the plan on the sheet.

5. A.M. 2-06.4.2.E The sheet called out as "DEVELOPMENT PLAN" shows sheet 1 of 2, the sheet index show sheet 1 of 2 as the "Development Plan cover sheet", clarify what is happening. Also there is a sheet 2 of 2 shown in the drawing index on sheet 1 of 2. Provide a cover sheet for the development package.

6. A.M. 2-06.4.3 Provide the following relevant case numbers on the plan adjacent to the title block on all sheets, DP13-0075 and DP12-0010.

7. A.M. 2-06.4.6 If the project is located within the boundaries of a Planned Area Development (PAD) zone, include a reduced-scale map of the PAD on the first sheet, indicating the location of the portion being developed.

8. A.M. 2-06.4.7.A.1 Provide a general note stating "EXISTING ZONING IS PAD-3.

9. A.M. 2-06.4.7.A.2 List the gross area of the site by square footage and acreage.

10. A.M. 2-06.4.7.A.4 Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

11. A.M. 2-06.4.7.A.6 Provide a general notes stating "THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA SEC. 5.4, MAJOR STREETS AND ROUTES (MS&R) SETBACK ZONE

12. A.M. 2-06.4.7.A.8.a Floor area for each building on the cover sheet.

13. A.M. 2-06.4.7.A.8.b Provide a building coverage calculation per PAD-3 on the cover sheet.

14. A.M. 2-06.4.7.A.8.b Provide a floor area ratio per PAD-3 on the cover sheet.

15. A.M. 2-06.4.7.A.8.c Provide a building area expansion calculation on the plan. Per UDC Section 7.4.3.E this expansion is cumulative.

16. A.M. 2-06.4.8.C The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

17. A.M. 2-06.4.9.F All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined.

18. A.M. 2-06.4.9.H Clearly show the extents of the proposed trellis on the plan.

19. A.M. 2-06.4.9.H Per UDC Section 7.4.6.F.2.a.1 Access lanes and PAALs must be setback at least one foot from an open structure, such as a carport or covered pedestrian access path as measured from the closest part of the structure or roof overhang. That said demonstrate on the plan how this requirement is met for all proposed trellis.

20. A.M. 2-06.4.9.H.a Provide a vehicle parking space calculation on the cover sheet. The vehicle parking space calculation provided on TS.1 is not correct. The vehicle parking space requirements are based on gross floor area (GFA) at a ratio of 1 space per 100 sq. ft. of GFA. As the proposed storage area will not be a separate use it is required to parked at 1 space per 100 sq. ft. of GFA. When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. That said the vehicle parking space calculation should include the entire site.

21. A.M. 2-06.4.9.H.d Provide a bicycle parking space calculation on the cover sheet. When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. That said the bicycle parking space calculation should include the entire site.

22. A.M. 2-06.4.9.Q Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

23. A.M. 2-06.4.9.R Per TSM 7-01.4.1.B A sidewalk is required adjacent and parallel to any access lane or PAAL on the side where buildings are located and per TSM 7-01.4.3.A All sidewalks must be a minimum of four (4) feet wide and installed to avoid any obstruction which decreases the minimum width to less than four (4) feet That said demonstrate on the plan that a four (4) sidewalk is provided along the east side of the proposed addition.

24. A.M. 2-06.4.9.R Per TSM 7-01.4.3.A All sidewalks must be a minimum of four (4) feet wide and installed to avoid any obstruction which decreases the minimum width to less than four (4) feet That said demonstrate on the plan that a four (4) sidewalk is maintained at all proposed trellis.

25. Sheet A.1 near the southwest corner of the building there is a proposed trellis. Under this trellis keynote 22 calls out bike racks to remain and there is also "WAITING ARE TRELLIS (NEW). Clarify what this area is going to be used for and if this is a new waiting area show the location for the relocated bike racks and demonstrate that the meet current code requirements.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

Sshield1 on DS1/planning/New Development Package/ DP13-0075

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package.
06/13/2013 RONALD BROWN H/C SITE REVIEW Approved
06/17/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Revise the site drawing to include the location of water lines, and fire hydrants. Reference: City of Tucson Administrative Manual No. 2-06.0.0, Section 4.8 and Section 107.2.13, IBC 2012.
06/21/2013 ANDREW CONNOR NPPO REVIEW Approved
06/21/2013 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change 1. Note: Existing development on the site is subject to the zoning regulations in effect at the time the existing development received zoning approval per AM 2-10.4.1. Identification and Descriptive Data

2. For area of expansion provide the following per

Location, size, and name of existing vegetation to remain in place

Both the proper and common name of each type of plant material

Replacement criteria, should plant material not survive

3. Ensure that all Zoning and Engineering comments and concerns are addressed

4. Additional comments may apply

Final Status

Task End Date Reviewer's Name Type of Review Description
06/25/2013 CPIERCE1 OUT TO CUSTOMER Completed
06/25/2013 CPIERCE1 REJECT SHELF Completed